2020/10/07 (Wednesday)
- Lab in-person: Matt
- Virtual partner: Zach, Ruiren
| Setup | Run 73. DIB 1/3/4 → Stripline 43/48/41 → pi-filters 1/2/3 → Cable 3/1/2 → nothing/nothing/accessory_interposer → HV_Conn 1/3/2 → HV 1/2 → DCRCX(4)/DCRC55(1)-master; DCRC33(2) → HV control. DCRCs off. Lead/poly shield erected (4 lead walls, 2 poly walls). |
|---|---|
| Status | Cooling after warmup to deal with clogged 1K Pot. LN2 transfer yesterday. |
| 0850 | MC(Cernox) = 77.4 K, Sorb = 137.1 K, G2/G1 (fridge+trap+dump) = 562/612 mbar, 3He pump off |
| 0905 | Matt Fritts body temperature = 97.8 F |
| 1050 | Matt enters lab |
| 1050 | IVC = 1.6 mbar |
| 1050 | Start pumping IVC with scroll pump. A few minutes later switch to Turbo. |
| 1050 | Turn on 3He pump and open V6 to 12.8%, reestablishing circulation like yesterday. G2/G1/P1 → 684/748/3.6 mbar and settle. |
| 1055 | Close V12a speedivalve for 2 minutes to assess throughput. G1 falls at 65.6 mbar/min, good. Reopen V12a speedivalve. |
| 1055 | Pump mixture from fridge and Trap 1 to Dump |
| Throughput test procedure, Cold Trap 1: |
- All mixture in dump, LN2 trap 1 cold, condenser & still valves open (3He pump on - optional)
- Open V9, V13a, V12a+speedivalve, V3. Wait for G1 to be close to G2.
- Close V12a+speedivalve and V3, open V1
- monitor G1
| 1110 | Perform mixture throughput test at MC = 77 K using above procedure with 3He pump on. Let G1 rise to 550 mbar before Step 3, then it falls to 70 mbar, then rises. Throughput = 42.0 mbar/min. Nearly the same as last time, 2020 Sep 18 |
|---|---|
| 1110 | Open mixture to both sides of the fridge and cold LN2 Trap 2. |
| 1115 | Begin blowing out LN2. Main bath (G3) = 800 mbar+1atm. That's kinda high… Adjust cylinder regulator, MB → 680 mbar+1atm. |
| 1127 | MB pressure dropping, probably almost finished with blowout |
| 1130 | MB → 157 mbar+1atm, flattening. Stop LN2 blowout |
| 1135 | Fill LN2 cold trap bath |
| 1135 | Start pumping out main bath with scroll pump. Takes 9 minutes to fall to 1 mbar. |
| 1150 | Pressurize MB with helium to 260 mbar above 1 atm. |
| 1155 | Isolate MB by closing V1a. Pump out line to the G3 volume with Scroll Pump. Isolate pump, then open 1K Pot speedivalve to check pressure: about 0.03 bar. Then pump out 1K Pot (needle valve closed) with Scroll Pump to 0.026 mbar on P2. Then close 1K Pot speedivalve and V4a. Open V1a again to monitor bath pressure. |
| 1205 | Turbo on IVC = 6.3 nbar. With Turbo valve out for a minute, IVC = 0.10 ubar |
| 1210 | Let 63 μbar He exchange gas into IVC. |
| 1210 | MC(Cernox) = 77.5 K, Sorb = 139.8 K, IVC = 63 μbar, G1(fridge) = 628.4 mbar. G3(MB) = 120 mbar+1atm. |
| 1223 | Begin initial LHe transfer |
| 1230 | MC(Cernox) = 78.1 K, Sorb = 147 K, IVC = 74 μbar, G1(fridge) = 628.7 mbar. G3(MB) = 764 mbar+1atm. |
| 1230 | Forgot to open MB recovery valve when I started the transfer - open it now. G3(MB) pressure drops to 260 mbar+1atm, then rises again to 595. |
| 1245 | MC(Cernox)/Sorb/1K Pot = 77.1/143/>7 K, IVC = 30 μbar, G1(fridge) = 625.3 mbar. G3(MB) = 439 mbar+1atm. |
| 1300 | MC(Cernox)/Sorb/1K Pot = 64.8/95.9/>7 K, IVC = 14 μbar, G1(fridge) = 585.7 mbar. MB = 2.3% / 485 mbar+1atm. |
| 1310 | MC(Cernox)/Sorb/1K Pot = 58.0/59.6/>7 K, IVC = 12 μbar, G1(fridge) = 538.3 mbar. MB = 11.9% / 465 mbar+1atm. |
| 1320 | MC(Cernox)/Sorb/1K Pot = 52.9/15.5/>7 K, IVC = 10 μbar, G1(fridge) = 494.3 mbar. MB = 27.0% / 437 mbar+1atm. |
| 1330 | MC(Cernox)/Sorb/1K Pot = 48.2/7.3/5.84 K, IVC = 8.6 μbar, G1(fridge) = 485.0 mbar. MB = 44.3% / 421 mbar+1atm. |
| 1340 | MC(Cernox)/Sorb/1K Pot = 43.2/7.1/5.71 K, IVC = 8.6 μbar, G1(fridge) = 480.5 mbar. MB = 64.0% / 410 mbar+1atm. |
| 1350 | MC(Cernox)/Sorb/1K Pot = 37.7/6.9/5.57 K, IVC = 7.4 μbar, G1(fridge) = 477.9 mbar. MB = 84.5% / 398 mbar+1atm. |
| 1355 | End LHe transfer @ MB = 90.5% |
| 1415 | MC(Cernox)/Sorb/1K Pot = 24.0/6.1/4.92 K, IVC = 7.4 μbar, G1(fridge) = 523.1 mbar. MB = 88.8% / 176 mbar+1atm. |
| 1430 | MC(Cernox)/Sorb/1K Pot = 16.8/5.8/4.66 K, IVC = 5.4 μbar, G1(fridge) = 531.5 mbar. |
| 1445 | MC(Cernox)/Sorb/1K Pot = 13.1/5.6/4.53 K, IVC = 4.0 μbar, G1(fridge) = 534.6 mbar. |
| 1456 | MC(Cernox)/Sorb/1K Pot = 10.0/5.5/4.42 K, IVC = 3.4 μbar Start pumping out IVC with Turbo Pump |
| 1500 | Turbo on IVC = 86 nbar. |
| 1500 | Matt leaves lab |
| 1720 | MC(Cernox)/Sorb/1K Pot = 4.94/6.8/5.32 K |
| 1720 | |
| 1720 | Matt Fritts body temperature = 97.5 F |