UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20180714

2018/07/14 (Saturday)

Previous Day

Setup: DIB1/3/4 → 3.2 MHz filters 2/3/1 → cable 3/1/2 → gender changer 3/?/2 → HVConn 1/3/2 → HV 1/2 → DCRC55(1)/DCRC50(3)
1335 Fill LN2 cold trap full.
1335 Tower = 33.1 mK, G1/G2 = 151.1/143.7 mbar, P1 = 0.140 mbar (Still heater = 4 mW), 1K pot = 1.631 K / 28 mbar. MB = 56.6%.

Next Day