2022/08/10 (Wednesday)
- Lab in-personnel: Giulia
| Status | Run 76 in progress |
|---|---|
| Setup | Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4) Lead/poly shield fully assembled. Boron-filled socks covering NaI detectors. PuBe behind lead wall on West side of lead/poly shield. |
| 1320 | MC/Coldplate = 44/155 mK, Still = 1.15 K / 0.130 mbar / 0 mW, G1/G2 = 160/145 mbar, 1K Pot = 50° / 1.64 K / 26±2 mbar, MB = 63.7% |
| 1330 | Fill LN2 cold trap bath |