2023/10/24 (Tuesday)
* Lab in-personnel: Himangshu
| 0855 | IVC closed and pressure valve closed. CVJ on turbo overnight. Main Bath is up(fridge closed) |
|---|---|
| 0930 | Turbo on IVC = 16 nbar, with turbo valved out for a min = 120 nbar |
| 1002 | Check contents of warm LN2 Trap 1: 10 mbar (11 on G1). Pump it out with the scroll pump. |
| 1005 | Insert cold trap 1 into the LN2 bath, begin filling with LN2 |
| 1011 | We are out of LN2. Refilling now |
| 1100 | Checked CVJ pressure again. With scroll: 54 ubar, with scroll valved out for a minute: 86 ubar |
| 1158 | Fill LN2 in the cold trap 1. |
| Pump out fridge lines: |
- Make sure mixture is isolated in the dump.
- Check fridge pressures by opening condenser speedivalve+V1 and still gate valve: LHe trap+Condenser(G1)/Still(P1) = (47.5-2.4=) 45.1/0.13 (1.2-0.07)) mbar.
- Connect scroll pump to He-4 pump line, turn it on.
- Open pump line valve, V5A, V2A, V7, V2, wait a minute, then open V3.
- You're now pumping on the fridge lines. Wait until P1 and G1 flatten out.
- Close condenser speedivalve and still gate valve, V1, V3, V2, V7, V2A, V5A and close and turn off the scroll pump.
| 1230 | G1 fell to about 1 mbar then rose to now 1.6 mbar, P1 still falling. Stopped at P1=0.45 mbar |
|---|---|
| 1235 | Throughput test procedure, Cold Trap 1: |
- All mixture in dump, LN2 trap 1 cold, condenser & still valves open (3He pump on - optional)
- Open V9, V13a, V12a+speedivalve, V3. Wait for G1 to be close to G2.
- Close V12a+speedivalve and V3, open V1
- monitor G1
| 1245 | Perform mixture throughput test at MC = 300 K using above procedure with 3He pump on. Let G1 rise to 600 mbar before Step 3, then it falls to 48.5 mbar on step 4 and starts to rise. Throughput = 6.5 mbar/min. |
|---|---|
| 1317 | Pump mixture back to dump: |
- Close V13A then turn on the 3He pump.
- Open V12A+speedivalve, V3.
- Open V6 initially to 11%, then further in steps to 30%, making sure G2 doesn't rise too quickly.
- Continue pumping until G1 stabilizes at a minimum value (typically a few mbar) and P1 is less than 0.1 mbar.
- Stop pumping on cold trap 1, close V12a and speedivalve.
- Stop pumping on fridge, close still gate valve, condenser speedivalve, V1, V3.
- Close V6, then when V6 is fully closed, close V9.