UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20161031

2016/10/31 (Monday)

Previous Day

Setup: DIB1/3/4 → 3.2 MHz filters → cables 1,2,3 → HV board inputs 1,3,2 → HV board outputs 1,2 → DCRC55(1)/50(3)
0855 Tower/MC/Coldplate = 31.7/34.6/211 mK, Still = 1.15-1.25 K / 120 μbar, G1/G2 = 165/155 mbar, 1K Pot = 1.74 K / 55 mbar. MB = 63.9%.
Boiloff rate: between slow- and fast-mode. Probably would have been better if pressure were released later yesterday, last release was 45 minutes after fill.
0900 Return Cf source to safe.
0905 Fill LN2 cold trap bath.
0940 Attempt measurement of parasitic resistance Rp for HV1pA. Using the assumption that the shunt resistance Rsh has the same Rp as the TES, we can say:
Rp = (ΔIb/ΔIs - 1)/(2 - ΔIb/ΔIs) * Rsh
Set QET bias to 0, 10, 20 μA, find baselines of 0, -0.382, -0.761 V, with Driver Gain = 2x. This yields Rp = 11 mΩ.
1350 Using same method as above, measured Rp for remaining channels. Accounting for this changes Rn considerably (c.f. 2016/10/27)
Channel TES Rp [mΩ] QET bias [μA] Rnormal [mΩ] Rbiased [mΩ] Rbiased/Rnormal
HV 1 pA 4 11 179 125 46.1 37 %
HV 1 pB 3 11 185 116 46.1 40 %
HV 1 pC 2 15 184 105 49.7 47 %
HV 2 pB 5 33 195* 287 208* 72* %
HV 2 pC 1 - 170 - - -
HV 2 pD 0 26 208 177 89.1 50 %
* No pulses seen.
1354 HV2PC seemed permanently railed. Zap Squids.
Channel TES Rp [mΩ] QET bias [μA] Rnormal [mΩ] Rbiased [mΩ] Rbiased/Rnormal
HV 2 pB 5 17 195 147 117 80 %
HV 2 pC 1 11 170 139 62 45%
HV 2 pD 0 21 208* 148 74* 50* %
* No pulses seen.
1620 1K Pot = 1.73 K / 45 mbar, stable all day. MB = 52.2%
1640 Fill LN2 cold trap bath

Next Day