2021/10/06 (Wednesday)
- Lab in-personnel: Matt
| Status | Run 74 finished. |
|---|---|
| All mixture is in dump. Fridge isolated. 1K Pot isolated. LN2 Trap 2 still has contaminants in it. MB in pit, clean tent erected. Cryostat vacuum jacket (CVJ) pumped out. IVC open | |
| 1130 | Detach remaining 4K heat sinks from tower. (The screws were pretty tight.) |