UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20180912

2018/09/12 (Wednesday)

Previous Day

Setup:
DIB1/3/4 → 3.2 MHz filters 2/3/1 → cable 3/1/2 → gender changer 3/?/2 → HVConn 1/3/2 → HV 1/2 → DCRC55(1)/DCRC50(3)

1.1kV → NaI B/C → Ortec 452(gain=5, shaping = 6 us, output=10V) / Ortec 575A(gain=10, shaping = 3us) → x10/x10 attenuator → DCRCX(4)
DCRC33(2) → kepco 1kV power supply → HV input
status: Took 133Ba data overnight at -80V.
0900 Tower/MC/Coldplate = 31.7/30.2/196 mK (cooling after a flash), Still = 1.0 mW / 1.8±0.1 K / 0.090 mbar, G1/G2 = 129/123 mbar, 1K Pot = 1.60 K / 18 mbar, Turbo on IVC = 0.86 nbar, MB = 38.1%
0905 Fill LN2 cold trap bath.
0955 MIDAS webpage has become unresponsive. 07180912_0916 has 36 dumps and counting.
0957 Restart MIDAS and DAQ programs. Sequence is stopped with an error. We'll ramp down the voltage and flash.
1000 Dial HV down to 0V using change_HV_80_to_0_DCRC2.msl
1015 Flash DCRCs 1,3 for 30 seconds
1100 Start 10 x 2hr Ba datasets at -80V split into 10min subruns, with CDMS and NaI detectors running and DCRC2 as HV controller. Using sequence HVscan-80×10-15_5PreBias-30Flash-30wait-2hrData-10minSubRun.msl
CDMS detector: Driver Gains = 2x, QET biases = (280/260/305)/(140/280/295) uA, Front-End Gains = 10
NaI detector: 1.1kV → NaI B/C → Ortec 452(gain=5, shaping = 6 us, output=10V, Pos) / Ortec 575A(gain=10, shaping = 3us, Pos) → x10/x10 attenuator → DCRC4PB/PA, Driver Gains = 1/1, PhononWaveFormLength = 1024 (512 samples), PhononPrepulseSamples = 64 (64 samples)
1000 BOR randoms, trigger on DCRC3pB/C/D threshold = 7/10/9
1320 Looks like DCRC1pB railed at around 12:24, and maybe other channels' baselines shifted around. Also at this time the Tower temperature rose a bit, from 31.7 mK to 32.2 mK. A bit odd… also G2 (3He pump outlet) pressure has gone up a little since that time, subtle effect, no other cryo symptoms.
1600 Start LHe transfer, Main Bath = 27.6%
1610 Hit Stop Immediately on sequencer, during its wait after a flash
1700 End LHe transfer, Main Bath = 93.2%
1754 Start 10 x 2hr Ba datasets at -80V split into 10min subruns, with CDMS and NaI detectors running and DCRC2 as HV controller. Using sequence HVscan-80×10-15_5PreBias-30Flash-30wait-2hrData-10minSubRun.msl
CDMS detector: Driver Gains = 2x, QET biases = (280/260/305)/(140/280/295) uA, Front-End Gains = 10
NaI detector: 1.1kV → NaI B/C → Ortec 452(gain=5, shaping = 6 us, output=10V, Pos) / Ortec 575A(gain=10, shaping = 3us, Pos) → x10/x10 attenuator → DCRC4PB/PA, Driver Gains = 1/1, PhononWaveFormLength = 1024 (512 samples), PhononPrepulseSamples = 64 (64 samples)
1000 BOR randoms, trigger on DCRC3pB/C/D threshold = 7/10/9

Next Day