| 1205 | MC = 0.43 K |
| 1206 | Turn off DAQ programs and unplug DCRCs 1&3 |
| 1208 | Turn on Still and MC heaters to 20 mW each |
| 1210 | Close 1K Pot speedivalve, V4a, 4He pump inlet valve. Turn off 4He pump. Close recovery valve to 4He pump outlet. NOTE: remember to open recovery valve when the pump is turned back on. |
| 1230 | MC(H35)/1KPot = 3.90/3.86 K |
| 1230 | G1(fridge) = 780 mbar. Open V9 to release mixture into dump |
| 1243 | MC temp starts to rise more quickly |
| 1245 | MC(H35)/1KPot = 4.78/4.33. Temperatures are relatively flat now. |
| 1250 | Check pressure in IVC: 0.54 ubar. |
| 1325 | Run the leak checked on the IVC, leak checker base = 0.2 pbar*L/s, leak checker on IVC peaked at 6.3 ubar*L/s |
| 1328 | Pump out IVC with the turbo pump, mc temp starts to rise again |
| 1607 | MC = 10.0 K. Turn off MC and Still heaters |