| Status | Run 74 in progress. First cooldown after IVC rebuild. |
| | Tower thermometer is reading high, probably this is a thermometer problem and the actual temperature is much lower. High noise in some of the charge channels. |
| | Setup: DIB1/2+acc → SL 41/43 → 3.2 MHz filters → cables 2/3 → nothing/Source_mover_board+HV_diverter_board → DCRC50(3)/55(1). Kepco 40V supplye → HV BNC. No lead/poly shield. Currently both DCRCs are on. |
| | Position of Am source: y = -30.00 mm |
| 1110 | Michael arrives in lab. |
| 1122 | Fill LN2 cold bath. |
| 1139 | Tower/MC/Coldplate = 80.9/33.6/ 191.5 mK, Still = 1.38 K / 0.08 mbar / 0 mW, G1/G2= 273.0/260.9 mbar, 1K Pot = 1.61 K / 20±1 mbar. MB = 36.5%. |
| 1210 | Start LHe transfer @ MB = 36.5% |
| 1235 | Main Bath level not increasing, actually decreased from 47%-44% on readout. Stopped fill procedure and removed all connections. Tested connectors with LHe from wall to see if gas flowed or was obstructed by ice. Both components let gas flow. Waiting for components to return to room temperature and have no condensation on surfaces. |
| 1236 | Nitrogen gas cylinder in back room is empty. Needs reorder. |
| 1250 | Flash detector for 10 minutes using DCRC1&3 LEDs. |
| 1300 | Start LHe transfer @ MB = 43.7% |
| 1336 | End LHe transfer @ MB = 85.1% |
| 1342 | Michael and Giulia leave lab |