UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20220508

2022/05/08 (Sunday)

Previous Day

  • Lab in-personnel: Matt
Status Run 76 in progress
Setup Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
1500 Begin LHe transfer @ MB = 34.3%
1510 Fill LN2 cold trap bath
1543 End LHe transfer @ MB = 95.7%
1555 MC/Coldplate = 28.4/149 mK, Still = 1.08 K / 0.100 mbar / 0 mW, G1/G2 = 92/103 mbar, 1K Pot = 18° / 1.54 K / 9±1 mbar

Next Day