| 1300 | Perform mixture throughput test at MC = 77 K using above procedure. Let G1 rise to 560 mbar before Step 3, then it falls to 31 mbar, then rises but very slowly. Throughput 0.34 mbar/min. Compare with 48.0 mbar on three days ago. |
| 1310 | Pump mixture back to dump |
| 1320 | Perform a second mixture throughput test. Let G1 rise to 568 mbar before Step 3, then it falls to 32 mbar, then rises but very slowly. Throughput 0.27 mbar/min. |
| | Begin warming up. |
| 1340 | Let about 0.04 bar He gas into IVC. MC temperature rising 0.1 K/min |
| 1410 | MC(Cernox) = 80.1 K, Sorb = 140.7 K, both rising |
| 1425 | Let N2 into the IVC up to about 0.2 bar |
| 1440 | MC(Cernox) = 80.7 K, Sorb = 143.3 K, main bath outer surface = 22.9 C |
| 1440 | Let 26 plastic-hose-lengths of N2 into cryostat vacuum jacket (equivalent of about 200 mbar at pump manifold). Vacuum jacket pressure = 8.6 mbar. Notice that main bath pressure increases. |
| 1450 | MC(Cernox) = 80.9 K, Sorb = 145.3 K, main bath outer surface = 22.0 C |
| 1500 | MC(Cernox) = 81.3 K, Sorb = 149.8 K, main bath outer surface = 21.4 C |
| 1540 | MC(Cernox) = 86.3 K, Sorb = 177.2 K, main bath outer surface = 20.2 C |
| 1550 | MC(Cernox) = 87.9 K, Sorb = 183.2 K, main bath outer surface = 20.0 C |
| 1605 | MC(Cernox) = 90.8 K, Sorb = 192.2 K, main bath outer surface = 19.7 C |
| 1615 | MC(Cernox) = 92.8 K, Sorb = 198.2 K, main bath outer surface = 19.5 C |
| 1625 | MC(Cernox) = 94.9 K, Sorb = 203.7 K, main bath outer surface = 19.4 C |
| 1630 | Main bath pressure hit 1 over 1atm (about 7 PSI). Release this to recovery. Got a few cubic feet on the meter. |
| 1635 | MC(Cernox) = 96.9 K, Sorb = 208.8 K, main bath outer surface = 19.4 C |
| | warming time constant is around 16.5 hours, should hit 273 K Sunday @ 4:30 am. |
| 1650 | Perform a third mixture throughput test, now at MC = 100 K. Let G1 rise to 571 mbar before Step 3, then it falls to 34 mbar, then rises but very slowly. Throughput 0.10 mbar/min. |
| 1655 | When MC hit around 100 K I noticed that the resistance of the short to chassis had started to rise, from 250 Ω to 350 Ω. Now, with the tower around 102 K, the resistance is much higher, around 1 MΩ. |
| 1700 | Now the short is around 80 kΩ. |
| 1705 | Short is around 100 kΩ, not very stable. |
| 1710 | MC(Cernox) = 104.1 K, Sorb = 224.6 K, main bath outer surface = 19.4 C |
| 1710 | Short has jumped up to 780 kΩ. |
| 1715 | Pump mixture out of fridge and LN2 cold trap to dump |
| 1715 | Short is reading 1.1 MΩ. |
| 1720 | MC(Cernox) = 106.1 K, Sorb = 229.1 K, main bath outer surface = 19.5 C |
| 1720 | Short is reading 1.1 MΩ. |
| 2235 | MC(Cernox) = 161.5 K |