| 0730 | Matt Fritts body temperature = 96.4 F |
| Setup | Run 73. DIB 1/3/4 → Stripline 43/48/41 → Cable 3/1/2 → nothing/nothing/accessory_interposer → HV_Conn 1/3/2 → HV 1/2 → DCRCX(4)/DCRC50(3)-master; DCRC33(2) → HV control. DCRCs on overnight. Lead/poly shield erected (4 lead walls, 2 poly walls). |
| 0650 | MB 24.9% |
| 0730 | Tower = 62.2 mK, G1/G2= 243/228 mbar, Still = 0.160 mbar / 5 mW, 1K Pot = 1.69 K / 45±4 mbar. |
| | Tower cooled steadily till about 1am (61 mK min) but has risen since. |
| 0850 | Tower/MC/Coldplate = 62.6/30.7/188 mK, Still = 1.45 K / 0.16 mbar / 5 mW, G1/G2= 243/229 mbar, 1K Pot = 1.69 K / 45±3 mbar. |
| 0913 | Begin LHe transfer @ MB = 18.8% |
| 0953 | End LHe transfer @ MB = 91.2% |
| 1025 | Recalibrate HV. New HV calibration file: HV_DCRC2_control_cals_500V_200721.txt at /home/hep/cdmssoft/repositories/MidasDAQ/online/scripts/pysequencer/HV_calibrations. Only a little different from the previous calibration. |
| 1030 | MB 91.0% |
| 1040 | Fill LN2 cold trap bath |
| 1045 | Matt leaves lab |