| Status | Warming up. All mixture in dump. LN2 trap 2 and LHe should be checked when warm. 1K Pot needle valve open, should be closed when warm before dropping cryostat. Some helium in cryostat vacuum jacket and IVC. |
|---|---|
| 0940 | MC(Cernox) = 289 K |
| 0945 | IVC = 7.4 mbar. Let 1 atm nitrogen into IVC. |
| 0950 | Close 1K Pot needle valve |
| 0950 | Close helium recovery valve for main bath |
| 1000 | Endstop1 to chassis resistance: 61 Ω. So after warming, the source holder is still in contact with the endstop. This is expected - the brass threaded rod will expand more than the copper plate, so if anything it should be pressing harder against the endstop. |
| 1025 | Cryostat vacuum jacket = 0.14 mbar. Start pumping out cryostat vacuum jacket, first with scroll then turbo. |
| 1040 | Turbo on cryostat vacuum jacket = 0.63 μbar. With turbo valved out, cryostat vacuum jacket = 46 μbar |
| 1100 | Turbo on cryostat vacuum jacket = 0.86 μbar. With turbo valved out, cryostat vacuum jacket = 34 μbar |
| 1200 | Turbo on cryostat vacuum jacket = 0.46 μbar. With turbo valved out, cryostat vacuum jacket = 25 μbar |
| 1240 | Turbo on cryostat vacuum jacket = 0.34 μbar. With turbo valved out, cryostat vacuum jacket = 22 μbar |
| 1350 | Turbo on cryostat vacuum jacket = 0.30 μbar. With turbo valved out, cryostat vacuum jacket = 16 μbar better than Sep 11, which was considered good enough to start Run 71. |
| 1510 | Turbo on cryostat vacuum jacket = 0.22 μbar. With turbo valved out, cryostat vacuum jacket = 12 μbar |
| 1620 | Turbo on cryostat vacuum jacket = 0.14 μbar. With turbo valved out, cryostat vacuum jacket = 10 μbar |
| 1625 | Stop pumping out cryostat vacuum jacket. |
| 1635 | Check contents of warm LN2 Trap 2: 20.8 mbar. Pump out with scroll pump. |
| 1645 | Check contents of warm LN2 Trap 1: 1.5 mbar. (This wasn't used during the run.) Pump out with scroll pump. |
| 1650 | Check contents of warm LHe Trap (by opening V1 and reading G1): 57 mbar. Wow, pretty high. Pump out with scroll pump. |
| 1655 | Lowered Dewar and erected clean tent. |