2023/11/04 (Saturday)
- Lab in-personnel: Himangshu
^ Status | Run 78. Tower cool, DCRCs off. |
| 1249 | Tower(U28)/MC(H35)/Coldplate = 71.3/29.8/145 mK, Still(P1) = 1.11 K / 0.11 mbar / 0 mW, G1/G2 = 162/147 mbar, 1K Pot(P2) = 37.5° / 1.65 K / 28 mbar, MB = 67.1% |
|---|---|
| 1250 | Fill LN2 cold trap from dewar |