2023/10/06 (Friday)

Previous Day

1556 Electrical check of ZC-39
  • Lab in-personnel: Ping

| Detector: | S104 || Stripline | 48 ||

SC: none 300 K 300 K
Face: 3 Date 10/06/2023
SQUET: ZC-39 Cable 1
Signal Pos. lead Gnd lead Nominal Actual Chassis
(Gnd lead)
Nominal:
< 0.1 nS
SQUID bias A/Ret 4 20 3 - 5 k 4.210 k OK
SQUID bias B/Ret 19 34 3.936 k OK
SQUID bias C/Ret 8 24 — k OK
SQUID bias D/Ret 23 39 — k OK
Feedback A/Ret 37 21 15 - 25 k 24.59 k OK
Feedback B/Ret 2 18 23.23 k OK
Feedback C/Ret 41 25 25.40 k OK
Feedback D/Ret 22 6 16.41 k OK
QET A/Ret 3 1, 13, 14, 17, 32 60 - 80 75, 66, 63, 63, 75 OK
QET B/Ret 35 29, 33, 47, 48 62, 63, 66, 63 OK
QET C/Ret 7 5, 9, 10, 28 62, 63, 55, 64 OK
QET D/Ret 38 36, 40, 43, 44 61, 62, 61, 61 OK
QET A/QET B 3 35 1000-3000 1768
QET A/QET C 3 7 2546
QET A/QET D 3 38 2291
QET B/QET C 35 7 2619
QET B/QET D 35 38 2352
QET C/QET D 7 38 1409
1557 Electrical check of ZC-70+interposer
Cooldown checkout sheet (rev C SQUET)
Detector: S104 Stripline 41
SC: none 300 K 300 K
Face: 5 Date 10/06/2023
SQUET: ZC-70 Cable 2
Signal Pos. lead Gnd lead Nominal Actual Chassis
(Gnd lead)
Nominal:
< 0.1 nS
SQUID bias A/Ret 4 20 3 - 5 k — k OK
SQUID bias B/Ret 19 34 4.269 k OK
SQUID bias C/Ret 8 24 4.548 k OK
SQUID bias D/Ret 23 39 5.036 k OK
Feedback A/Ret 37 21 15 - 25 k 28.98 k OK
Feedback B/Ret 2 18 25.35 k OK
Feedback C/Ret 41 25 28.06 k OK
Feedback D/Ret 22 6 34.13 k OK
QET A/Ret 3 1, 13, 14, 17, 32 60 - 80 OL, 80, OL, OL, OL OK
QET B/Ret 35 29, 33, 47, 48 75, 75, OL, OL OK
QET C/Ret 7 5, 9, 10, 28 74, 74, OL, OL OK
QET D/Ret 38 36, 40, 43, 44 77, 78, OL, OL OK
QET A/QET B 3 35 1000-3000 OL
QET A/QET C 3 7 OL
QET A/QET D 3 38 OL
QET B/QET C 35 7 OL
QET B/QET D 35 38 OL
QET C/QET D 7 38 OL
LED 1 chassis 42 1.0 - 1.1 V 1.105
LED 2 chassis 26 1.69
Motor Coil 1 pBr3 pBr4 0.173 k
Motor Coil 2 pCr3 pCr4 0.159 k
Near Endstop pAr3 pAr4 0.170 k
Far Endstop pAr5 pDr3 0.173 k
Thermometer ROX pAr1 pDr4 67 ohm
1631 3rd Electrical check of ZC-13 after connecting to Stripline 43 on Tower Face 2
Cooldown checkout sheet (rev C SQUET)
Detector: S104 Stripline 43
SC: none 300 K 300 K
Face: 2 Date 10/06/2023
SQUET: ZC-13 Cable 3
Signal Pos. lead Gnd lead Nominal Actual Chassis
(Gnd lead)
Nominal:
< 0.1 nS
SQUID bias A/Ret 4 20 3 - 5 k 4.588 k OK
SQUID bias B/Ret 19 34 4.763 k OK
SQUID bias C/Ret 8 24 — k OK
SQUID bias D/Ret 23 39 4.871 k OK
Feedback A/Ret 37 21 15 - 25 k 18.79 k OK
Feedback B/Ret 2 18 19.85 k OK
Feedback C/Ret 41 25 — k OK
Feedback D/Ret 22 6 20.60 k OK
QET A/Ret 3 1, 13, 14, 17, 32 60 - 80 89.9, 71, 69, 69.6, 75.9 OK
QET B/Ret 35 29, 33, 47, 48 69.3, 69.6, 81.9, 69.5 OK
QET C/Ret 7 5, 9, 10, 28 70, 69.6, 60.6, 69.1 OK
QET D/Ret 38 36, 40, 43, 44 80.1, 77.9, 76.9, 77.3 OK
QET A/QET B 3 35 1000-3000 788
QET A/QET C 3 7 1667
QET A/QET D 3 38 1375
QET B/QET C 35 7 1792
QET B/QET D 35 38 1647
QET C/QET D 7 38 2077