2021/12/19 (Sunday)
- Lab in-personnel: Zach, Giovanna
| Status | Run 75 in progress |
|---|---|
| Setup | Tower Faces 5/3/2 → Cables 2/1/3 → nothing/diverter_board/nothing → DCRC55(1)/DCRC50(3)/DCRCx(4) |
| 1400 | Goldman/Tower/MC(H35)/Coldplate = 48.9/89.7/36.6/218 mK, Still = 1.62 K / 0.130 mbar / 0 mW, G1/G2= 169.3/179.9 mbar, 1K Pot = 1.629 K / 22 mbar. |
| 1414 | Begin LHe transfer @ MB = 24.0% |
| 1430 | Filled LN2 cold trap dewar. |
| 1445 | Ended LHe transfer @ MB = 88.3 |