| Status | Run 76 in progress |
| Setup | Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4) |
| 1115 | MC/Coldplate = 28.6/146 mK, Still = 1.09 K / 0.100 mbar / 0 mW, G1/G2 = 135/137 mbar, 1K Pot = 45° / 1.55 K / 8.5±0.5 mbar, MB = 66.2% |
| 1125 | Fill LN2 cold trap bath. |
| 1430 | Install poly sheets on North side of lead/poly shield |
| 1510 | Start building lead wall (lead stack) on West side of fridge (to shield detectors from PuBe gammas). Here's a photo from June 2018 and a diagram from March 2019. First the steel platform is set sideways on the fridge pillar bases, with wood and lead sheets under it, left from the last time. Then a steel plate, 3/16“ thick and about 12.5” by 23“ is set on top as a base for the 2x4x8” lead bricks. Final dimensions of main part of lead wall are 12x24x16“ (16” is the height). |