UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20250725

2025/07/25 (Friday)

Previous Day

  • Lab in-personnel: Himangshu, Yan
Status Trap warmed up to room temperature this morning.
10:30 Open V3. Reading pressure ~25 mBar. Use the scroll to pump out the trap.
11:00 starting another round of cryocleaning.
12:10 collecting mix into the dump.
12:50 Heat gun on trap, reading ~10 mbar. Use the scroll to pump out the trap.
1300 cold trap 1 in LN2 can.
Pump out fridge lines:
  1. Make sure mixture is isolated in the dump.
  2. Check fridge pressures by opening condenser speedivalve+V1 and still gate valve: LHe trap+Condenser(G1)/Still(P1) = (47.5-2.4=) 45.1/0.13 (1.2-0.07)) mbar.
  3. Connect scroll pump to He-4 pump line, turn it on.
  4. Open pump line valve, V5A, V2A, V7, V2, wait a minute, then open V3.
  5. You're now pumping on the fridge lines. Wait until P1 and G1 flatten out.
  6. Close condenser speedivalve and still gate valve, V1, V3, V2, V7, V2A, V5A and close and turn off the scroll pump.
1330 P1 takes a long time to lower down as the Still is a big bellow while V5 is a thin line. P1 still falling. Reconnected with Leak detector to use as a pump (vane pump will be more effective). Kept pumping overnight and Stopped at P1 ~ 300 mTorr

Next Day