| 1555 | Check contents of warm LN2 Trap 1: 11.9 mbar (12.3 on G1). Pump it out with the scroll pump. |
| 1558 | G1 = 1.9 mbar and stable, stop pumping on Trap 1 |
| 1604 | Insert LN2 cold trap 1 and begin filling cold trap dewar with LN2 |
| 1609 | Begin cryocleaning mixture through cold trap 1 following the procedure in procedure:cryoclean_mixture |
| 1613 | Open V6 to 12.0% to restart flow |
| 1616 | Open V6 to 12.2% to restart flow |
| 1629 | Tried increasing V6 to restart flow, but G1 rose too quickly. Closed V4 and turning V6 to 0.0% then restarted cryocleaning at V6 = 12.0% |
| 1638 | Open V6 to 12.3% to restart flow |
| 1645 | Open V6 to 12.4% to restart flow |
| 1725 | End cryocleaning mixture through trap 1. Pump mixture to dump |
| 1752 | P1 = 0.007 mbar, G1 = 1.7 mbar and stable. Close all valves and turn off 3He pump, leaving 723.4 mbar in dump |
| 1753 | Remove cold trap 1 from the LN2 bath to warm up overnight |