2018/05/23 (Wednesday)

Previous Day

Status: Replaced 1K pot shaft orings. Cleaning mixture.
0854 IVC pressure = 5.4 mbar
1340 Pump out fridge lines with scroll pump.
1344 Let mixture from 3He pump through cold LN2 Trap 1 into fridge lines, both sides. (Most mixture still in dump.)
1350 Pump out main bath with scroll pump.
1353 Once P2 < 10 mbar, open 1K pot speedivalve. Open 1K pot needle valve 5 full turns.
1356 P2 = 0.4 mbar, close V1A and 1K pot speedivalve.
1401 Open V5A, V2A, vent speedivalve to pump out clear He hose. Close off scroll pump.
1405 Pressurize main bath and 1K pot with helium to 316 mbar above 1 atm on G3.
1406 Close 1K pot needle valve.
1413 Begin LN2 transfer
1420 MC(Cernox) = 291.8 K, IVC = 5.4 mbar, G1 (fridge) = 211 mbar, New level resistor = 2.163 kΩ
1430 MC(Cernox) = 290.2 K, IVC = 4.6 mbar, G1 (fridge) = 208 mbar, New level resistor = 2.269 kΩ
1450 MC(Cernox) = 273.9 K, IVC = 3.4 mbar, G1 (fridge) = 205 mbar, New level resistor = 2.884 kΩ
1505 MC(Cernox) = 249.8 K, IVC = 3.0 mbar, G1 (fridge) = 203 mbar, New level resistor = 2.996 kΩ
1520 MC(Cernox) = 230.2 K, IVC = 2.5 mbar, G1 (fridge) = 202 mbar, New level resistor = 3.005 kΩ
1540 MC(Cernox) = 209.7 K, IVC = 2.5 mbar, G1 (fridge) = 202 mbar, New level resistor = 3.005 kΩ
1600 MC(Cernox) = 199.4 K, IVC = 2.5 mbar, G1 (fridge) = 200 mbar, New level resistor = 3.005 kΩ
1625 MC(Cernox)/Sorb = 176.0/183.9 K, IVC = 2.2 mbar, G1 (fridge) = 199 mbar, New level resistor = 3.004 kΩ
1627 Open LN2 dewar valve open all the way. It was already quite open (~3 turns) though.
1632 Cease LN2 transfer. Started to hear LN2 splash out of the open main bath port.
1634 MC(Cernox)/Sorb = 170.2/175.1 K, IVC = 2.2 mbar, G1 (fridge) = 197 mbar, New level resistor = 2.999 kΩ
1800 Fill LN2 cold trap full
Cryocleaning mixture
0858 Check pressure in warm Trap 1: 28.2 mbar. Pump out with scroll pump
0905 Start cleaning mixture through cold LN2 Trap 2, V6 = 12.9%
0909 Increase V6 to 13.0% to speed up circulation
0912 Increase V6 to 13.1% to speed up circulation
0920 Increase V6 to 13.2% to speed up circulation
0955 Stop cleaning trap 2, 50 min
1012 Start cleaning mixture through cold LN2 Trap 1, V6 = 13.1%
1016 Increase V6 to 13.3% to speed up circulation
1102 Stop cleaning trap 1, 50 min
1115 Check pressure in warm Trap 2: 7.9 mbar. Pump out with scroll pump
1127 Start cleaning mixture through cold LN2 Trap 2, V6 = 13.1%
1129 Increase V6 to 13.2% to speed up circulation
1132 Increase V6 to 13.3% to speed up circulation
1135 Increase V6 to 13.4% to speed up circulation
1217 Stop cleaning trap 2, 50 min
1235 Check pressure in warm Trap 1: 12.2 mbar. Pump out with scroll pump
1332 Check pressure in warm Trap 2: 4.3 mbar. Pump out with scroll pump