2022/01/29 (Saturday)
- Lab in-personnel: Matt
| Status | Run 75 in progress |
|---|---|
| Setup | Tower Faces 5/3/2 → Cables 2/1/3 → nothing/diverter_board/nothing → DCRC55(1)/DCRC50(3)/DCRCx(4) Lead shield in place. Am Source y = 0.03 mm |
| 1455 | Goldman/Tower/MC(H35)/Coldplate = 41.1/72.2/33.9/179 mK, Still = 1.35 K / 0.110 mbar / 0 mW, G1/G2= 258/245 mbar, 1K Pot = 1.59 K / 11±1 mbar, MB = 62.6%. |
| 1455 | Fill LN2 cold trap bath. |