UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20180412

2018/04/12 (Thursday)

Previous Day

Status: Tower assembled, ready to install. Mixture cleaned several times. Cryostat vacuum jacket pumped out.
0925 Check pressure in warm LN2 Trap 1: 6.4 mbar. Pump out with scroll pump.
0930 Check pressure in warm LN2 Trap 2: 4.5 mbar. Pump out with scroll pump.
0940 Start cryocleaning mixture through cold LN2 Trap 2, V6 = 12.6%
0950 Increase V6→12.9% to restart flow
0950 Increase V6→13.0% to speed up flow
1015 Increase V6→13.2% to speed up flow. Trap return tube gets frosty up past the o-ring flange. G2 maxxed at 700 mbar then falling slowly.
1050 Stop cryocleaning. Trap 2, 70 minutes. G2 = 645 mbar. Pump mixture back to dump.
1235 Start cryocleaning mixture through cold LN2 Trap 1, V6 = 13.2%
1400 Increase V6→13.4% to restart flow
1450 Stop cryocleaning. Trap 1, 135 minutes. G2 = 592 mbar. Pump mixture back to dump.
Cryocleaning log
date trap duration (minutes) contaminants removed (mbar)
Apr 6 1 70 9.5
Apr 6 2 70 6.6
Apr 6 1 70 11.0
Apr 6-7 2 overnight, no circ, dump exposed to trap 12.8
Apr 7-9 1 overnight, no circ, pump exposed to trap 6.8
Apr 9 2 70 8.9
Apr 9 1 60 9.0
Apr 10 2 90 10.5
Apr 10 1 70 8.5
Apr 10 2 75 6.6
Apr 10 1 70 1.9
Apr 11 2 75 2.7
Apr 11 1 75 14.4
Apr 11 2 70 4.5
Apr 11 1 70 6.4
Apr 12 2 70
1056 Install tower, begin installing 100mK stage.
1300 Finish installing 100mK stage. Aggressively copper tape all gaps. Connect 600mK rod. Notice that 4K stripline heatsink at the bottom of the IVC is not connected! We must have left this off last time, but it didn't seem to matter.

Next Day