2017/09/05 (Tuesday)

Previous Day

Status Both LN2 traps warm and pumped out. Mixture in dump (LHe cold trap isolated at around 20 K). 1K Pot needle valve open. Cryostat vacuum jacket pumped out.
1115 Post-run 63 tower electrical checkout:
Detector G132 DIB 1
side coax ST-3-3 date/who: 2017-09-05 GR MF
face 1
+lead - lead signal typical prev. measured
1 2 QET A 100 to 200 Ω 174 Ω 174 Ω
2 4 QETA-B 100 to 200 Ω 209 206 Ω
3 4 QET B 100 to 200 Ω 184 Ω 183 Ω
4 6 QETB-C 100 to 200 Ω 184 183 Ω
5 6 QET C 100 to 200 Ω 157 Ω 157 Ω
6 8 QETC-D 100 to 200 Ω 172 170 Ω
7 8 QET D 100 to 200 Ω 97.5 Ω 98 Ω
2 8 QETA-D 100 to 200 Ω 179 177 Ω
9 chassis LED1 Rforward 8 to 9 MΩ 730 kΩ 680 kΩ
9 chassis LED1 Vforward 1.0 to 1.1 V 1.18 V 1.118 V
chassis 9 LED1 Rreverse <1 nS 1.5 nS 2 nS
10 chassis LED2 Rforward 8 to 9 MΩ 740 kΩ 740 kΩ
10 chassis LED2 Vforward 1.0 to 1.1 V 1.11 V 1.15 V
chassis 10 LED2 Rreverse <1 nS 1.8 nS 2 nS
1 11 Qo Rbias 24 to 26 nS 25 nS 25 nS
12 11 Qo C coupling <1 nS <1 nS <1 nS
12 13 Qo Rfeedback 24 to 26 nS 25 nS 25 nS
1 14 Qi Rbias 24 to 26 nS 26 nS 25 nS
15 14 Qi C coupling <1 nS <1 nS <1 nS
15 16 Qi Rfeedback 25 nS 25 nS
All pins → Ground <1.0nS short 1-8 ~150 Ω, 9-10 ~700 kΩ
Detector G132 DIB 3
side coax ST-3-9 date/who: 2017-09-05 GR MF
face 5
+lead - lead signal typical prev. measured
1 2 QET A 100 to 200 Ω 114 Ω 114 Ω
2 4 QETA-B 100 to 200 Ω 161 159 Ω
3 4 QET B 100 to 200 Ω 129 Ω 129 Ω
4 6 QETB-C 100 to 200 Ω 186* Ω open
5 6 QET C 100 to 200 Ω 153* Ω open
4 5 QETB-C 100 to 200 Ω 169 166 Ω
6 8 QETC-D 100 to 200 Ω 260 open
7 8 QET D 100 to 200 Ω 132 Ω 133 Ω
2 8 QETA-D 100 to 200 Ω 167 165 Ω
9 chassis LED1 Rforward 8 to 9 MΩ 336 980 kΩ
9 chassis LED1 Vforward 1.0 to 1.1 V 0.65! V ol
chassis 9 LED1 Rreverse <1 nS 15 MΩ 16 MΩ
10 chassis LED2 Rforward 8 to 9 MΩ 793 kΩ 790 kΩ
10 chassis LED2 Vforward 1.0 to 1.1 V 1.11 V 1.116 V
chassis 10 LED2 Rreverse <1 nS <1 ns <1 nS
1 11 Qo Rbias 24 to 26 nS 25 nS 25 nS
12 11 Qo C coupling <1 nS <1 nS <1 nS
12 13 Qo Rfeedback 24 to 26 nS 25 nS 25 nS
1 14 Qi Rbias 24 to 26 nS 25 nS 25 nS
15 14 Qi C coupling <1 nS <1 nS <1 nS
15 16 Qi Rfeedback 24 to 26 nS 25 nS 25 nS
All pins → Ground <1.0nS short, ~MΩ 1-8. Later worrse 1-8 ~100Ω except 6 open. Others open
* = this was open at first. Pushed on the side coax at dib to fix it
! = here's the 1650 nm LED
after we found the shorts on this DIB we found them on DIB 1 as well, originally that one was ok
Detector G132 DIB 4
side coax ST-3-10 date/who: 2017-09-05 GR MF
face 3
+lead - lead signal typical prev. measured
1 2 QET A 100 to 200 Ω 143 Ω 143 Ω
2 4 QETA-B 100 to 200 Ω 188 Ω 189 Ω
3 4 QET B 100 to 200 Ω 185 Ω 186 Ω
4 6 QETB-C 100 to 200 Ω 200 Ω 204 Ω
5 6 QET C 100 to 200 Ω 181 Ω 182 Ω
6 8 QETC-D 100 to 200 Ω 190 Ω 191 Ω
7 8 QET D 100 to 200 Ω 134 Ω 132 Ω
2 8 QETA-D 100 to 200 Ω 174 Ω 175 Ω
9 chassis LED1 Rforward 8 to 9 MΩ 794 kΩ 790 kΩ
9 chassis LED1 Vforward 1.0 to 1.1 V 1.11 V 1.12 V
chassis 9 LED1 Rreverse <1 nS <1 nS 1 nS
10 chassis LED2 Rforward 8 to 9 MΩ 786 kΩ 790 kΩ
10 chassis LED2 Vforward 1.0 to 1.1 V 1.10 V 1.2 V
chassis 10 LED2 Rreverse <1 nS <1 nS 1 nS
1 11 Qo Rbias 24 to 26 nS n/c <1 nS
12 11 Qo C coupling <1 nS <1 nS <1 nS
12 13 Qo Rfeedback 24 to 26 nS 26 nS 26 nS
1 14 Qi Rbias 24 to 26 nS n/c n/c
15 14 Qi C coupling <1 nS <1 nS <1 nS
15 16 Qi Rfeedback 24 to 26 nS 26 nS 26 nS
All pins → Ground <1.0nS 1-8 ~100-400 Ω

previous:

Pins to chassis [Ω]
1 2 3 4 5 6 7 8
DIB1 132 127 126 124 122 121 95 96
DIB3 53 61 107 104 106 115 114 111
DIB4 114 113 123 124 123 127 115 112

now:

Pins to chassis [Ω]
1 2 3 4 5 6 7 8
DIB1 132 127 126 124 122 121 95 96
DIB3 53 61 107 104 106 115 114 111
DIB4 114 113 123 124 123 127 115 112
1155 On DIB3pC (5-6), which is open, we were able to get it to connect by pushing in the side coax at the detector dib. ~120 Ω. Becomes open again when you stop pushing on it.
1200 Continue tower disassembly
1215 While removing side coax ST-3-9, hit wirebond area with thumb. Probably broke some bonds… yes, seems like all resistor connections are broken, maybe one of the capacitor connections. Will need to repair with wirebonder. Althrough we only need two to run charge on the iZIP, so could wait on this.
1245 Put G132 in purge. NOTE: we forgot to put the tower in purge after deinstallation, so it has been in the anteroom for a week.

Next Day