2022/05/01 (Sunday)
- Lab in-personnel: Giulia
| Status | Run 76 in progress |
|---|---|
| Setup | Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRC52(6) |
| 1640 | Fill LN2 cold trap bath |
| 1645 | MC/Coldplate = 28.4/140 mK, Still = 1.09 K / 0.100 mbar / 0 mW, G1/G2 = 115/120 mbar, 1K Pot = 18° / 1.56 K / 10±1 mbar, MB = 60.0% |