| 1300 | Perform mixture throughput test at MC = 77 K using above procedure. Let G1 rise to 582 mbar before Step 3, then it falls to 81 mbar, then begins to rise. Throughput 47.7 mbar/min. Significantly higher than Run 66. |
| 1325 | Perform electrical check. On DIB2, the short that we saw on qI before at 77K is back, but it has a much higher resistance. Qi_feedback-chassis = 7.5 nS. Chassis-qI_drain or source = 15 nS. So the short is on the order of 70 MOhm, instead of the 1 MOhm we saw before. Hopefully we can live with this. |
| 1345 | MC(Cernox) = 77.0 K, Sorb = 122.5 K, IVC = 1.9 mbar, G1 (fridge) = 608 mbar, Level resistor = 1.213 kΩ. |
| 1355 | MC(Cernox) = 77.0 K, Sorb = 120.9 K, IVC = 1.9 mbar, G1 (fridge) = 607 mbar, Level resistor = 1.339 kΩ. |
| 1414 | MC(Cernox) = 77.0 K, Sorb = 119.0 K, IVC = 1.9 mbar, G1 (fridge) = 605 mbar, Level resistor = 1.339 kΩ. |
| 1431 | MC(Cernox) = 77.0 K, Sorb = 118.2 K, IVC = 1.9 mbar, G1 (fridge) = 603 mbar, Level resistor = 1.339 kΩ. |
| 1433 | Stop LN2 transfer. |