| Status | Run 74 in progress. Warming up after 3rd appearance of IVC leak at 4K. Helium in Cryostat Vacuum Jacket. Mixture in dump. |
| 1040 | MC = 265 K, rising 1.2 K/hr, suggests warming tau = 25.3 hrs, projected to reach dew point tonight at 7:26 PM |
| 1945 | Matt enters lab |
| 1950 | MC(Cernox) = 274.8 K |
| 1950 | Check IVC pressure: 0.58 bar. |
| 1955 | Slowly fill IVC with N2 gas to 0.96 bar. Isolate IVC. |
| 2005 | Check pressure in Cryostat Vacuum Jacket: 0.3 mbar. Start pumping out with Scroll Pump. @ < 0.1 mbar switch to Turbo Pump. |
| 2020 | Remove all MB bolts |
| 2020 | Matt exits lab |