UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20190920

2019/09/20 (Friday)

Previous Day

Status: IVC sealed and pumping overnight. Have cryocleaned mixture 11 times so far. Mixture open to both cold LN2 traps.
0850 Turbo pumping pressure on IVC = 140 nbar. With pump valve out, IVC = 7.4 ubar (after several minutes).
0855 Fill LN2 cold trap bath
0900 Pump mixture from cold LN2 Traps 1&2 to dump.
1015 Our Pfeiffer leak detector forepump was rebuilt this summer, but when we finally tried to start it again it does not turn.
Trying to run the leak detector with the scroll pump used as the forepump now.
1040 Start pumping IVC with leak detector (LD), valve out turbo pump. Leak settles around 5 pbarL/s.
1100 Leak check passed, no sudden increases in leak rate during He spray test.
1150 Check warm LN2 Cold Trap 1: 6.3 mbar. Pump out trap with scroll pump.
1200 Check warm LN2 Cold Trap 2: 2.7 mbar. Pump out trap with scroll pump.
1200 Removed 6.3 mbar from Trap 1 after overnight passive mixture cleaning.
Removed 2.7 mbar from Trap 2 after overnight passive mixture cleaning.
1210 Check fridge pressures: LHe trap/Condenser/Still = 3.0/0.2/0.068 mbar. Pump out with scroll pump.
1230 Raise main bath
Throughput test procedure, Cold Trap 2:
  1. All mixture in dump, LN2 trap 2 cold, condenser & still valves open (3He pump on - optional)
  2. Open V9, V13b, V12b+speedivalve, V3. Wait for G1 to be close to G2.
  3. Close V13a+speedivalve and V3, open V1
  4. monitor G1
1240 Perform mixture throughput test at MC = 300 K using above procedure with 3He pump off. Let G1 rise to 525 mbar before Step 3, then it falls to 37 mbar and starts to rise. Throughput = 5.4 mbar/min.
1250 With 1K Pot speedivalve and needle valve closed, pump on Main bath with scroll pump.
Once P2 < 100 mbar, open 1K pot speedivalve and needle valve (5 turns) to pump out 1K pot volume to < 1 mbar on P2.
1305 Close off scroll pump, then pressurized bath and 1K Pot (both sides) to about 0.5 bar with helium. Then pump it out again with scroll pump to < 1 mbar.
1310 Close off scroll pump, then pressurized bath and 1K Pot (both sides) to about 0.5 bar with helium. Then pump it out again with scroll pump to < 1 mbar.
1325 Pressurize main bath and 1K Pot (both sides) with helium to 300 mbar +1atm on G3, then close 1K Pot speedivalve and needle valve.
1330 Turbo on IVC = 120 nbar. With turbo valved out for a few minutes, IVC = 4.6 ubar.
1335 Let 5.4 mbar He exchange gas into IVC
1345 As on 2019 May 18 during last run (Run 70), we will flow mixture through the fridge during LN2 cooldown. Dump is open to cold LN2 Trap 2 and fridge: V9, V13b, V12b+speedi, V1, Condenser speedi, Still gate valves open. Turn on 3He pump. Now open V6 to 12.8%.
1350 Circulation pressures settle to G2/G1/P1 = 654/723/0.45 mbar
1350 MC(Cernox) = 299.0 K, Sorb = >249 K (max), IVC = 5.4 mbar, G2/G1/P1 (circulation) = 655/723/0.3 mbar, Level resistor = 0.995 kΩ
1400 Begin LN2 transfer
1405 MC(Cernox) = 297.9 K, Sorb = >249 K (max), IVC = 4.6 mbar, G2/G1/P1 (circulation) = 657/726/1.5 mbar, Level resistor = 1.099 kΩ
1410 MC(Cernox) = 293.0 K, Sorb = >249 K (max), IVC = 4.6 mbar, G2/G1/P1 (circulation) = 658/726/2.6 mbar, Level resistor = 1.140 kΩ
1415 Close V12b speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 12.9 mbar/min. Open V12b speedivalve again.
1420 MC(Cernox) = 276.5 K, Sorb = >249 K (max), IVC = 3.4 mbar, G2/G1/P1 (circulation) = 658/726/4.5 mbar, Level resistor = 1.230 kΩ
1430 MC(Cernox) = 247.3 K, Sorb = >249 K (max), IVC = 3.0 mbar, G2/G1/P1 (circulation) = 659/725/8.0 mbar, Level resistor = 1.232 kΩ
1430 Close V12b speedivalve for 2 minutes to assess throughput. G1 falls at 16.0 mbar/min. Open V12b speedivalve again.
1445 MC(Cernox) = 203.0 K, Sorb = >249 K (max), IVC = 3.0 mbar, G2/G1/P1 (circulation) = 658/725/50.0 mbar, Level resistor = 1.186 kΩ
LN2 Dewar has run dry. I guess that's why the Level Resistor resistance got lower.
1455 MC(Cernox) = 181.9 K, Sorb = 236 K, IVC = 3.0 mbar, G2/G1/P1 (circulation) = 657/723/(off scale) mbar, Level resistor = 1.185 kΩ
1500 Close V12b speedivalve for 2 minutes to assess throughput. G1 falls at 30.2 mbar/min. Open V12b speedivalve again.
1505 MC(Cernox) = 168.6 K, Sorb = 216 K, IVC = 2.2 mbar, G2/G1 (circulation) = 657/722 mbar, Level resistor = 1.184 kΩ
1530 MC(Cernox) = 141.5 K, Sorb = 181 K, IVC = 1.9 mbar, G2/G1 (circulation) = 651/716 mbar, Level resistor = 1.185 kΩ
1545 MC(Cernox) = 130.5 K, Sorb = 171 K, IVC = 1.9 mbar, G2/G1 (circulation) = 647/711 mbar, Level resistor = 1.186 kΩ
1600 Restart LN2 transfer with freshly filled Dewar
Sorb temperature starts falling faster.
1615 MC(Cernox) = 113.3 K, Sorb = 148 K, IVC = 1.6 mbar, G2/G1 (circulation) = 637/698 mbar, Level resistor = 1.352 kΩ
1625 Close V12b speedivalve for 2 minutes to assess throughput. G1 falls at 45.3 mbar/min. Open V12b speedivalve again.
1640 MC(Cernox) = 101.9 K, Sorb = 125 K, IVC = 1.6 mbar, G2/G1 (circulation) = 624/684 mbar, Level resistor = 1.352 kΩ
1640 Stop LN2 transfer.
1650 Close V6 to stop circulating mixture. Turn off 3He pump.

Next Day