2023/11/03 (Friday)
- Lab in-personnel: Zach, Ping
| Status | Run 78. Tower cool, DCRCs off. |
|---|
| 1315 | Tower(U28)/MC(H35)/Coldplate = 72.0/29.8/145 mK, Still(P1) = 1.11 K / 0.11 mbar / 0 mW, G1/G2 = 154/149 mbar, 1K Pot(P2) = 37.5° / 1.65 K / 28 mbar, MB = 24.9% |
|---|---|
| 1318 | Fill LN2 cold trap from dewar |
| 1403 | Begin LHe transfer @ MB = 23.1% |
| 1500 | End LHe transfer @ MB = 92.7% |