2023/01/31 (Tuesday)
- Lab in-personnel: Himangshu, Zach, Carson
| Status | Run 77 preparation |
|---|---|
| Setup | Fridge closed, pumping on IVC, preparing for cooldown |
| 1210 | Turbo on IVC = 8.6 nbar, with turbo valved out for a min = 120 nbar |
|---|---|
| 1215 | Check contents of warm LN2 Trap 1: 0.5 mbar (3.6 on G1). Pump it out with the scroll pump. |
| 1222 | Insert cold trap 1 into the LN2 bath, begin filling with LN2 |
| 1230 | Pump out fridge lines: |
- Make sure mixture is isolated in the dump.
- Check fridge pressures by opening condenser speedivalve+V1 and still gate valve: LHe trap+Condenser(G1)/Still(P1) = 4.7/0.7 mbar.
- Connect scroll pump to He-4 pump line, turn it on.
- Open pump line valve, V5A, V2A, V7, V2, wait a minute, then open V3.
- You're now pumping on the fridge lines. Wait until P1 and G1 flatten out.
- Close condenser speedivalve and still gate valve, V1, V3, V2, V7, V2A, V5A and close and turn off the scroll pump.
| 1252 | G1 fell to about 1 mbar then rose to now 1.6 mbar, P1 still falling to 0.38 mbar now. |
|---|---|
| 1300 | Perform a quick leak check, no issues seen |
| Throughput test procedure, Cold Trap 1: |
- All mixture in dump, LN2 trap 1 cold, condenser & still valves open (3He pump on - optional)
- Open V9, V13a, V12a+speedivalve, V3. Wait for G1 to be close to G2.
- Close V12a+speedivalve and V3, open V1
- monitor G1
| 1310 | Perform mixture throughput test at MC = 300 K using above procedure with 3He pump on. Let G1 rise to 600 mbar before Step 3, then it falls to 62 mbar on step 4 and starts to rise. Throughput = 7.2 mbar/min. |
|---|---|
| 1325 | Pump mixture back to dump: |
- Close V13A then turn on the 3He pump.
- Open V12A+speedivalve, V3.
- Open V6 initially to 11%, then further in steps to 30%, making sure G2 doesn't rise too quickly.
- Continue pumping until G1 stabilizes at a minimum value (typically a few mbar) and P1 is less than 0.1 mbar.
- Stop pumping on cold trap 1, close V12a and speedivalve.
- Stop pumping on fridge, close still gate valve, condenser speedivalve, V1, V3.
- Close V6, then when V6 is fully closed, close V9.
| Pump out 1kpot and main bath: |
- Check pressure in 1K Pot on P2 by opening the 1kpot speedivalve and V4A. Pump out with Scroll Pump connected to the 4He line.
- Close the 1kpot speedivalve, close the scroll pump valve.
- Open V1A which opens up the line to the main bath (this will cause the line to expand as the gas fills it).
- Pump on Main Bath with scroll pump, making sure not to overload the scroll pump.
- Once P2 < 2 mbar, open 1K Pot speedivalve and needle valve (5 turns) to pump out 1K pot volume to < 1 mbar on P2.
| 1340 | Check pressure in 1K Pot by opening the 1kpot speedivalve and V4A: 32 mbar on P2, 0.05 atm on mechanical gauge. Pump out with Scroll Pump |
|---|---|
| 1348 | Close 1kpot speedivalve, close scroll pump valve, open V1A which opens up the line to the main bath (this will cause the line to expand as the gas fills it). |
| 1350 | Pump on Main Bath with scroll pump, making sure not to overload the scroll pump. |
| 1400 | G1 = 1.7 mbar, P1 = 0.28 mbar and stable |
| 1400 | Isolate LN2 Trap 1 which is now pumped out to dump (close V12a and speedivalve) |
| 1405 | Stop pumping out fridge (close Still Gate valve, Condenser speedivalve, V1, V3) |
| 1406 | Close V6, then when V6 is fully closed, close V9, leaving G2(Dump) = 709.5 mbar |
| 1410 | P2 < 2 mbar, open 1K Pot speedivalve and needle valve (5 turns) to pump out 1K pot volume to < 1 mbar on P2. |
| Flush the 1kpot and main bath: |
- With the scroll pump pumping on the He-4 pump line, open V5A, V2A, and the vent speedivalve to evacuate the clear hose leading to the He gas line.
- Once P2 falls to <1 mbar, close the He-4 pump line valve and turn off the He-4 pump or scroll pump.
- Open the blue valve that connects gas line to IGH - gas is filling the main bath now.
- Once the mechanical gauge (connected to the 1kpot speedivalve) reaches 15mmHg, the bath is at ~0.5bar, stop flushing.
- Pump out with the scroll pump to < 1 mbar on P2, making sure not to overload the pump.
- Close the scroll pump valve and repeat steps 3 to 5 once more
- Close the scroll pump and pressurize the main bath and 1K Pot with helium to a few 100 mbar+1atm on G3, then close 1K Pot speedivalve and needle valve.
| 1500 | Close off scroll pump, then pressurize bath and 1K Pot (both sides) to about 0.5 bar with helium. Then pump it out again with scroll pump to < 1 mbar on P2. |
|---|---|
| 1515 | Close off scroll pump, then pressurize bath and 1K Pot (both sides) to about 0.5 bar with helium. Then pump it out again with scroll pump to < 1 mbar on P2. |
| 1525 | Pressurize main bath and 1K Pot (both sides) with helium to 305 mbar+1atm on G3, then close 1K Pot speedivalve and needle valve, V1a, V4a, V5a, V2a. |
| 1535 | As on 2021 Nov 30, we will flow mixture through the fridge during LN2 cooldown. Let mixture from dump through cold LN2 Trap 1 to fridge, both sides. Then isolate the sides and circulate with V6 open partially and mix open to dump. V9, V13a, V12a+speedi, V1, Condenser speedi, Still gate valves open, 3He pump on. Open V6 to 12.6%. |
| Flow mixture through fridge: |
- Open V9, V13a, V12a+speedivalve, V1, condenser speedivalve, still gate, V3, let things settle.
- Turn on 3He pump, after a min, open V6 to 12.6% and close V3.
| 1548 | P1(Condenser) → 0.065 mbar. |
|---|---|
| 1550 | Try closing V12a speedivalve. G1 falls as it should, showing we have throughput. Falls at 12 mbar/min . Open V12a speedivalve again. |
| 1555 | Let 5.4 mbar He exchange gas into IVC, this is a bit more than one hose length (connected to the mechanical gauge on the turbo pump) |
| 1610 | MC(Cernox) = 296.2 K, Sorb = >249 K (max), IVC = 5.4 mbar, G2/G1/P1 (circulation) = 655/730/0.085 mbar, Level resistor = 0.975 kΩ. |
| 1642 | Can't find part to connect the LN2 transfer stick to the hose |
| 1700 | Pump mixture to dump. Close V13a, open V3, open V6 more in steps up to 30% |
| 1720 | G1 = 1.6 mbar, P1 = 0.06 mbar. Stop pumping mixture to dump. Close V12a+speedivalve, close condenser speedivalve and still gate, close V1, close V3, close V6 |
| 1725 | V6 is fully closed, close V9, leaving 713.9 mbar in the dump. Turn off 3He pump |