UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20240131

2024/01/31 (Wednesday)

Previous Day

  • Lab in-personnel: Himangshu
Status Run 79 beginning. Fridge at base temperature.
1220 Refilled LN2 Cold Trap 1 from dewar.
1200 Tower/MC(H35)/Coldplate = 66.5/34.9/147 mK, Still = 1.11 K / 0.110 mbar / 0 mW, G1/G2= 69/76 mbar, 1K Pot = 45° / 1.64 K / 24 mbar. MB = 33.5% . No DCRCS are turned ON yet for today.
1232 Start MIDAS in cdms2(if not already running). Power ON the DCRC3 (donot plug the IO cable yet) using the ethernet cable. Start Frontend GUIs(dcrc_driver01, towerfe3_01, triggerfe2). (Open SQUIDTuningGUI, select correct DCRC and click SQUID Control, Select correct DCRC and Initialize each phonon channel if not done. Close SQUID Control) , Stop Frontend, Unplug ethernet cable, connect IO cable, Start Frontend again
1247 DCRC3 is connected to Cable2+diverter to get squid tuning parameters
Cable 2: SQuid Bias: 0, -85, -81.36, -83.1 LockPoint: 0, -4.98, -4.42, -4.11
1257 Check response to QET bias changes. pB,pC,pD show response but no pulses yet. Tower temp went upwards to 71 mK from 62 mK after connecting this cable
1305 Stop Run(if run in progress). click SQUID Control, Initialize all phonon channels. Close SQUID Control. Stop Frontends. Unplug ethernet cable to power off the DCRC
1316 DCRC3 is initialized. Connect Cable 1 and Start frontends(dcrc_driver01, towerfe3_01, triggerfe2). Set SQUID bias and lockpoints. (SQuid Bias: -89.8, -91.6, -74.6, -100.5 LockPoint: -8.28, -5.07, -4.21, -7.36 ). Need to change Open Loop to Non-inverting and Pre-Amp to Feedback as well
Tower temp went from 62.9 mK to 63 and came back down to 62.7 mK
1337 Zap SQUID since pattern on pA is not making sense
1420 Need to change Open Loop to Non-inverting and Pre-Amp to Feedback as well
1540 DCRC3 is initialized. Connect Cable 1 and Start frontends(dcrc_driver01, towerfe3_01, triggerfe2). Set SQUID bias and lockpoints. (SQuid Bias: -91.7, -88.4, -74.6, -100.5 LockPoint: -9.45, -3.01, -4.21, -7.36 ). Need to change Open Loop to Non-inverting and Pre-Amp to Feedback as well
1545 DCRC3 is initialized. Connect Cable 2+diverter and Start frontends(dcrc_driver01, towerfe3_01, triggerfe2). Set SQUID bias and lockpoints. (SQuid Bias: 0, -85, -81.36, -83.1 LockPoint: 0, -4.98, -4.42, -4.11 ). Need to change Open Loop to Non-inverting and Pre-Amp to Feedback as well
1617 No pulses seen on Cable 2. Tower temp rises from 62.8 mK to 70.6 mK since this DCRC is on.
1641 DCRC3 is initialized. Connect Cable 3 and Start frontends(dcrc_driver01, towerfe3_01, triggerfe2). Set SQUID bias and lockpoints. (SQuid Bias: -70.4, -101.7, 0, -75.4 LockPoint: -4.55, -4.65, 0, -2.64 ). Need to change Open Loop to Non-inverting and Pre-Amp to Feedback as well

Next Day