| | Setup: DIB1/3/4 → SL 27/19/20 → 3.2 MHz filters → cables 2,1,3 → HV board inputs 1,3,2 → HV board outputs 1,2 → DCRC55(1)/50(3). Also DCRC4 is powered and hooked up to control the HV setting. |
| 0850 | Restart MIDAS. |
| 1621 | Tower/MC/Coldplate = 24.2/25.9/155 mK, Still = 1.2 K / 0.110 mbar, G1/G2 = 221/199 mbar, 1K Pot = 1.65 K / 38 mbar, MB = 59.9% |
| 1623 | Fill LN2 cold trap full. |
| 1628 | Begin IbIs data sequence on DCRC3pB with HV=0V from 750 to 300 uA in -1.0 uA steps, 3 seconds of data per step. (IbIsDCRC3pB.msl) |
| | sequence finished but we forgot to start the DAQ programs, so need to redo it. |
| 2405 | Restart MIDAS, then start DAQ programs |
| 2406 | Begin IbIs data sequence on DCRC3pB with HV=0V from 750 to 300 uA in -1.0 uA steps, 3 seconds of data per step. (IbIsDCRC3pB.msl) |
| | files are unusually small, 383 K. hmm… they seem to have no data in them. |
| 2425 | DAQ programs wouldn't stay on. Restart MIDAS again. Then restart DAQ programs. |
| 2435 | DAQ programs won't stay on. Giving up. I assume we'll need to powercycle the DCRCs. |