UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20171223

2017/12/23 (Saturday)

Previous Day

Setup: DIB1/3/4 → SL 27/19/20 → 3.2 MHz filters → cables 2,1,3 → HV board inputs 1,3,2 → HV board outputs 1,2 → DCRC55(1)/50(3). DCRC4 → HV power supply.
0735 Tower = 21.8 mK
0735 HV = 69.89 V, V_leak = 2.45 mV
1720 Tower/MC/Coldplate = 21.7/25.4/155 mK, Still = 1.3 K / 0.100 mbar, G1/G2 = 224/201 mbar, 1K Pot = 1.62 K / 26 mbar, MB = 19.9%
1730 Begin LHe transfer @ MB = 19.9%
1735 Fill LN2 cold trap bath
1828 Finish LHe transfer @ MB = 91.9%
We'll do another long sequence like a yesterday, but try a lower trigger thresshold
1852 Start sequence of 12 30-minute background data series at HV = 70V, Driver Gains = 2x, QET biases = 480/360/440/480/380/490 uA, Front-End Gains = 10/5 on DCRC1/3, 1000 initial randoms, trigger on DCRC3pC threshold = 11, flashing then waiting 30min after each series, using modified triggerfe, using sequencer script DataLoop_70V_30min_groundflash_30min
First series: 1904
1910 HV = 69.90 V, V_leak = 2.78 mV
1910 Tower = 21.6

Next Day