| Status | Run 74 prep. Main bath is up. Need to do more cryocleaning and prepare room-temperature circuit for HV biasing. |
| 1200 | Matt enters lab. |
| 1235 | Check contents of warm LN2 Trap 2: 5.0 mbar. Pump out with Scroll Pump |
| 1305 | Check contents of warm LN2 Trap 1: 9.7 mbar. Pump out with Scroll Pump |
| 1325 | Work on diverter board for HV biasing. The plan is to use a second board, in series with the board that's already hooked up for the source mover. There is a biasing board used previously (in a 150mm run) with two coaxes and two resistors mounted. It's a 10 MOhm bias resistor and a 1 kOhm test resistor. So we just need to solder a lead to the appropriate bias wire and one to analog ground. |
| | |
| 1335 | Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 11.3% |
| 1340 | Increase V6 → 11.4% to restart flow |
| 1345 | Increase V6 → 11.5% to restart flow |
| 1355 | Increase V6 → 11.6% to speed up flow |
| 1415 | Increase V6 → 11.7% to speed up flow |
| 1440 | Stop cleaning through Trap 1 after 65 min. G2 flow pressure was 560-770 mbar. Pump mixture to dump.
Removed 6.5 mbar. |
| 1445 | Finish preparing HV diverter board. Bias connected to Pin 1 on Dsub, which is QET A Ret 1, which is what we have the Side2 electrode connected to. Switched off all phonon-related dip switches to break contact to detector - only LED, Q, FET related ones connected. Verified continuity between Side2 bias and the DIB2 charge channels by connecting board to Cable 3 and breakout box. Couldn't do a full checkout because some of the diverter board pins don't seem to connect well to the breakout box Dsub connector. |
| 1545 | Start cryocleaning mixture through LN2 Cold Trap 2, V6 = 11.8% |
| 1555 | Matt exits lab |
| 1635 | Increase V6 → 11.9% to speed up flow |
| 1650 | Increase V6 → 12.0% to speed up flow |
| 1710 | Stop cleaning through Trap 2 after 85 min. G2 flow pressure was 570-890 mbar (but toward the end began to rise to >1 bar). Pump mixture to dump.
Removed 4.7 mbar. |