2019/08/23 (Friday)
| Setup | DIB1/3/4 → 3.2 MHz filters 2/3/1 → cable 3/1/2 → gender changer ?/3/2 → HVConn 1/3/2 → HV 1/2 → DCRCX(4)/DCRC55(1) DCRC33(2) → 1kV power supply → HV input NaI B → DCRC50(3) pB Lead/poly shield erected, south wall partial lead only (with NaI detectors). |
|---|---|
| PuBe source in lab. | |
| 0800 | Fill LN2 cold trap bath. |
| 0810 | Tower/MC/Coldplate = 39.2/30.4/201 mK, Still = 1.29 K/ 0.085 mbar / 0 mW, G1/G2= 100/94 mbar, 1K Pot = 1.62 K / 20 mbar. MB= 34.6% |
| 0957 | Start a sequence of 8 @ 34 min series at HV = 180→327V, rate 4.31V/min, with 10% prebias for 2 minutes, flash at end with 30 min wait. CDMS detector: Driver Gains = 1x, DCRC4/1 QET biases = (490/400/495)/(420/480/450) uA, Front-End Gains = (2/2/3)/(5/5/5) 1000 BOR, 5Hz InRun randoms, trigger on DCRC1pD threshold = 6, baseline/sample length = 120/28 (standard 16/5), phonon pre-pulse 500 (standard is 500). NaI detector: 800 V → NaI B (dynode terminated) → PS776 → Lecroy 628 Fan In/Out → Ortec 452(Neg input, G=100, shaping=6us, -10V output) → DCRC3 PB, Driver Gains = 1, PhononWaveFormLength = 1024 (512 samples), PhononPrepulseSamples = 512 (512 samples) Use sequence HVdrift_8X180V_4p31VPM_loopversion_prebias_10_2_dur_34min_flashDCRC_1_4.msl |
| 1254 | Pause script after 2nd series. |
| 1325 | Begin LHe transfer MB=27.0 |
| 1405 | End LHe transfer MB=92.8 |
| 1417 | Resume script |
| 1445 | towerfe3_01 seems to have crashed shortly after the series resumed. Sequencer is stopped with error: Cannot start run: Cannot start run: or timeout froun: or timeout fro_01' on host c fro_01' on host. HV is at 182 V. |
| 1446 | Restart dcrc programs. Manually dial down HV and flash. MIDAS feels sluggish. |
| 1523 | Accidentally flash again because I hit “start sequence” without realizing “testflash” was still loaded. |
| 1620 | Start a sequence of 8 @ 34 min series at HV = 180→327V, rate 4.31V/min, with 10% prebias for 2 minutes, flash at end with 30 min wait. CDMS detector: Driver Gains = 1x, DCRC4/1 QET biases = (490/400/495)/(420/480/450) uA, Front-End Gains = (2/2/3)/(5/5/5) 1000 BOR, 5Hz InRun randoms, trigger on DCRC1pD threshold = 6, baseline/sample length = 120/28 (standard 16/5), phonon pre-pulse 500 (standard is 500). NaI detector: 800 V → NaI B (dynode terminated) → PS776 → Lecroy 628 Fan In/Out → Ortec 452(Neg input, G=100, shaping=6us, -10V output) → DCRC3 PB, Driver Gains = 1, PhononWaveFormLength = 1024 (512 samples), PhononPrepulseSamples = 512 (512 samples) Use sequence HVdrift_8X180V_4p31VPM_loopversion_prebias_10_2_dur_34min_flashDCRC_1_4.msl |