2021/02/12 (Friday)

Previous Day

  • Lab in-person: Matt
  • Virtual partner: Zach, Derek
Status Run 74 prep. Main bath is up. Need to do more cryocleaning and prepare room-temperature circuit for HV biasing.
1320 Matt enters lab.
1330 Check contents of warm LN2 Trap 1: 6.5 mbar. Pump out with Scroll Pump
1355 Check contents of warm LN2 Trap 2: 4.7 mbar. Pump out with Scroll Pump
1410 Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 11.3%
1415 Increase V6 → 11.5% to restart flow
1425 Increase V6 → 11.6% to speed up flow
1445 Increase V6 → 11.7% to speed up flow
1500 Increase V6 → 11.8% to speed up flow. Pressure looks like it's going up too fast, so step back down to 11.7%. (Not sure whether this makes any difference due to possible slop in V6 needle valve.)
1510 Stop cleaning through Trap 1 after 60 min. G2 flow pressure was 570-640 mbar, then up to 930 mbar toward the end. Pump mixture to dump.
Removed 6.7 mbar.
1500 Check source mover diverter board settings. The DIP switches set to OFF to disconnect the through-lines correspond to coils and end stops. So these all make sense. This will be used in series with the HV diverter board with DIB 2 (Cable 3).
1540 Start cryocleaning mixture through LN2 Cold Trap 2, V6 = 11.9%
1845 Stop cleaning through Trap 2 after 185 min. G2 flow pressure was 570-810 mbar. Pump mixture to dump.
Removed 3.1 mbar.
1555 Matt exits lab