UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20220130

2022/01/30 (Sunday)

Previous Day

  • Lab in-personnel: Matt
Status Run 75 in progress
Setup Tower Faces 5/3/2 → Cables 2/1/3 → nothing/diverter_board/nothing → DCRC55(1)/DCRC50(3)/DCRCx(4)
Lead shield in place. Am Source y = 0.03 mm
1420 Goldman/Tower/MC(H35)/Coldplate = 41.7/73.1/34.2/182 mK, Still = 1.38 K / 0.110 mbar / 0 mW, G1/G2= 262/241 mbar, 1K Pot = 1.58 K / 11±1 mbar, MB = 29.9%.
1427 Begin LHe transfer @ MB = 29.9%
1435 Fill LN2 cold trap bath.
1503 End LHe transfer @ MB = 92.6%

Next Day