UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20180715

2018/07/15 (Sunday)

Previous Day

Setup: DIB1/3/4 → 3.2 MHz filters 2/3/1 → cable 3/1/2 → gender changer 3/?/2 → HVConn 1/3/2 → HV 1/2 → DCRC55(1)/DCRC50(3)
1503 Fill LN2 cold trap full.
1505 Tower = 33.4 mK, G1/G2 = 152.7/147.4 mbar, P1 = 0.140 mbar (Still heater = 4 mW), 1K pot = 1.636 K / 30 mbar. MB = 15.7%.
1518 Start LHe transfer (MB = 15.7%)
1620 End LHe transfer (MB = 91.3%)
1633 Tower = 33.4 mK, G1/G2 = 143.2/139.9 mbar, P1 = 0.140 mbar (Still heater = 4 mW), 1K pot = 1.616 K / 30 mbar.

Next Day