2015/11/24 (Tuesday)

Previous Day

0810 Status: Tower installed, electrical checkout OK.
0830 Put IVC bottom on by two screws, do quick electrical checkout: looks OK.
0925 All screws on IVC bottom tightened. Begin slowly pumping out IVC on both sides with scroll pump.
0940 IVC = 340 mbar
0945 remove mini cleanroom
0955 IVC = 160 mbar, open valve to pump a little wider
1005 IVC = 0.086 mbar with valve to scroll pump fully open
1020 IVC = 0.063 mbar pumping, 0.12 mbar with pump valved out. Begin turbo pumping IVC.
1035 IVC = 1.0e-3 mbar, turbo pumping pressure
1050 Turn on leak checker
1100 IVC = 0.54e-3 mbar, turbo pumping pressure
1115 IVC = 0.40e-3 mbar, turbo pumping pressure
1120 Try pumping on IVC with LD. ~1000 e-9mbarL/s. Pretty high background, back to turbo pumping.
1300 IVC = 0.25e-3 mbar / 10e-3 mbar with pump valved out
1305 Try leak detector on IVC, after 5 minutes background = 870 e-9mbarL/s
1400 G1=7.3 mbar, G2=756 mbar (He-3 pump off), P1=3.4 mbar, P2=1 bar. Close V9 to isolate dump. Turn on He4 pump to pump out P2. Isolate He4 pump once P2>0.02 and open P2 to cold traps, one at a time. After several minutes P2 reads 50mbar of dirt in two LN cold traps combined (34/16 mbar in Trap1/2). Open up He4 pump valve to pump out.
1430 IVC = 0.14e-3 mbar / 7.4e-3 mbar with pump valved out
1450 Leak detector background ~80 pbar*l/s isolated, 590 pbar*l/s when pumping on IVC
1500 Leak check all seals. No convincing leaks, some deviations of about 20 pbar*l/s. Should pump it lower and leak check again.
1505 Isolate cold traps and He4 pump. Open gate valve, P1 rises from 3.6 mbar to 5 mbar. Turn off leak checker.
1512 Open condenser line to let material from He cold trap into P1. After a few minutes P1 rises to 60 mbar. G3=8.3 mbar; open V1 and V3 , P1 rises to 1 bar and G1 rises to 25.4 mbar.
1515 Open V9 to allow dump mixture to flow to G2. Turn on He3 pump and G2 reaches 784.3 mbar. Close V3 and open V5 and V6. Now condenser valve, gate valve, V1, V4, V6, and V9 are open, pumping all mixture/fridge contents to the dump.
1525 Fill LN2 cold trap.
Somewhere around here, begin cleaning mixture
1532 G2=790.8 mbar, P1=0.020 mbar, G1=0.5 mbar.
1655 Confirm that there is still flow before leaving. Also, pressure in IVC has dropped from 1E-4 mbar (roughly an hour prior) to 7.4E-5 mbar, a good sign.