2016/03/23 (Wednesday)
| Status: | Tower uninstalled and placed in clean room. Clean tent still on opened fridge. |
|---|---|
| 1100 | Go into cleanroom, and disassemble tower. Place Pb source in non-purge cabinet for storage until next run. Remove G106a and perform electrical check. |
| Detector | G106A | DIB | 1 | |
|---|---|---|---|---|
| date/who: | 2015-03-23 | DS NM | ||
| +lead | - lead | signal | typical | measured |
| 1 | 2 | QET A | 100 to 200 Ω | 30.0 Ω |
| 3 | 4 | QET B | 100 to 200 Ω | 90.5 Ω |
| 5 | 6 | QET C | 100 to 200 Ω | 89.2 Ω |
| 7 | 8 | QET D | 100 to 200 Ω | 58.0 Ω |
| 9 | chassis | LED1 Rforward | 8 to 9 MΩ | 760 kΩ |
| 9 | chassis | LED1 Vforward | 1.0 to 1.1 V | 1.040 V |
| chassis | 9 | LED1 Rreverse | <1 nS | <1 nS |
| 10 | chassis | LED2 Rforward | 8 to 9 MΩ | 739kΩ |
| 10 | chassis | LED2 Vforward | 1.0 to 1.1 V | 1.040 V |
| chassis | 10 | LED2 Rreverse | <1 nS | <1 nS |
| 11 | 12 | Qo-Qi | 55.6Ω | |
| 12 | 11 | Qi-Qo | 53.4Ω |
| Detector | G106A | DIB | 2 | |
|---|---|---|---|---|
| date/who: | 2015-03-23 | DS NM | ||
| +lead | - lead | signal | typical | measured |
| 1 | 2 | QET A | 100 to 200 Ω | 104.4 Ω |
| 3 | 4 | QET B | 100 to 200 Ω | 30.7 Ω |
| 5 | 6 | QET C | 100 to 200 Ω | 74.4 Ω |
| 7 | 8 | QET D | 100 to 200 Ω | 29.7 Ω |
| 9 | chassis | LED1 Rforward | 8 to 9 MΩ | 758kΩ |
| 9 | chassis | LED1 Vforward | 1.0 to 1.1 V | 1.040V |
| chassis | 9 | LED1 Rreverse | <1 nS | < 1 nS |
| 10 | chassis | LED2 Rforward | 8 to 9 MΩ | 728 kΩ |
| 10 | chassis | LED2 Vforward | 1.0 to 1.1 V | 1.040V |
| chassis | 10 | LED2 Rreverse | <1 nS | <1 nS |
| 11 | 12 | Qo-Qi | 48.5Ω | |
| 12 | 11 | Qi-Qo | 44.3Ω |
| Detector | G106A | DIB | 3 | |
|---|---|---|---|---|
| date/who: | 2015-03-23 | DS NM | ||
| +lead | - lead | signal | typical | measured |
| 1 | 2 | QET A | 100 to 200 Ω | 94.8 Ω |
| 3 | 4 | QET B | 100 to 200 Ω | 114.7 Ω |
| 5 | 6 | QET C | 100 to 200 Ω | 66.5 Ω |
| 7 | 8 | QET D | 100 to 200 Ω | 61.8 Ω |
| 9 | chassis | LED1 Rforward | 8 to 9 MΩ | 13MΩ |
| 9 | chassis | LED1 Vforward | 1.0 to 1.1 V | 1.04 |
| chassis | 9 | LED1 Rreverse | <1 nS | closed |
| 10 | chassis | LED2 Rforward | 8 to 9 MΩ | 135kΩ |
| 10 | chassis | LED2 Vforward | 1.0 to 1.1 V | 1.03 |
| chassis | 10 | LED2 Rreverse | <1 nS | closed |
| 11 | 12 | Qo-Qi | open | |
| 12 | 11 | Qi-Qo | open |
| 1320 | Place G106A in the purge cabinet. |
|---|---|
| 1520 | Remove G114 from purge cabinet and commence Detector Electrical Check: |
| Detector | G114 | DIB | 1 | |
|---|---|---|---|---|
| date/who: | 2015-03-23 | DS NM | ||
| +lead | - lead | signal | typical | measured |
| 1 | 2 | QET A | 100 to 200 Ω | open |
| 3 | 4 | QET B | 100 to 200 Ω | 166.3 Ω |
| 5 | 6 | QET C | 100 to 200 Ω | 133 Ω |
| 7 | 8 | QET D | 100 to 200 Ω | 73.4 Ω |
| 9 | chassis | LED1 Rforward | 8 to 9 MΩ | open |
| 9 | chassis | LED1 Vforward | 1.0 to 1.1 V | open |
| chassis | 9 | LED1 Rreverse | <1 nS | <1 nS |
| 10 | chassis | LED2 Rforward | 8 to 9 MΩ | 745kΩ |
| 10 | chassis | LED2 Vforward | 1.0 to 1.1 V | 1.040 V |
| chassis | 10 | LED2 Rreverse | <1 nS | <1 nS |
| 11 | 12 | Qo-Qi | 87.7Ω | |
| 12 | 11 | Qi-Qo | 82.8Ω |
| Detector | G114 | DIB | 2 | |
|---|---|---|---|---|
| date/who: | 2015-03-23 | DS NM | ||
| +lead | - lead | signal | typical | measured |
| 1 | 2 | QET A | 100 to 200 Ω | 155 Ω |
| 3 | 4 | QET B | 100 to 200 Ω | 35.4 Ω |
| 5 | 6 | QET C | 100 to 200 Ω | 108.3 Ω |
| 7 | 8 | QET D | 100 to 200 Ω | 35.0 Ω |
| 9 | chassis | LED1 Rforward | 8 to 9 MΩ | 744kΩ |
| 9 | chassis | LED1 Vforward | 1.0 to 1.1 V | 1.040V |
| chassis | 9 | LED1 Rreverse | <1 nS | < 1 nS |
| 10 | chassis | LED2 Rforward | 8 to 9 MΩ | 745 kΩ |
| 10 | chassis | LED2 Vforward | 1.0 to 1.1 V | 1.041V |
| chassis | 10 | LED2 Rreverse | <1 nS | <1 nS |
| 11 | 12 | Qo-Qi | 212kΩ | |
| 12 | 11 | Qi-Qo | 2.2MΩ |
| Detector | G114 | DIB | 3 | |
|---|---|---|---|---|
| date/who: | 2015-03-23 | DS NM | ||
| +lead | - lead | signal | typical | measured |
| 1 | 2 | QET A | 100 to 200 Ω | 31.1 Ω |
| 3 | 4 | QET B | 100 to 200 Ω | 81.2 Ω |
| 5 | 6 | QET C | 100 to 200 Ω | 30.4 Ω |
| 7 | 8 | QET D | 100 to 200 Ω | 83.2 Ω |
| 9 | chassis | LED1 Rforward | 8 to 9 MΩ | open |
| 9 | chassis | LED1 Vforward | 1.0 to 1.1 V | open |
| chassis | 9 | LED1 Rreverse | <1 nS | <0.1 nS |
| 10 | chassis | LED2 Rforward | 8 to 9 MΩ | open |
| 10 | chassis | LED2 Vforward | 1.0 to 1.1 V | open |
| chassis | 10 | LED2 Rreverse | <1 nS | <0.1nS |
| 11 | 12 | Qo-Qi | open | |
| 12 | 11 | Qi-Qo | open |
| Note: There are some distinct differences between G114 and G106a from the previous run, both ostensibly iZIPv6: | |
|---|---|
| open phonon channel | DIB1 pA (which is Side1 pB) is open, so that's one phonon channel that certainly won't work |
| fewer LEDs | One LED on DIB1 seems to be open and both LEDs on DIB3 are open (maybe no LEDs were ever wired on DIB3). So half the number of LEDs that G106a had. |
| Ka-Chunk | While handling G114, an internal noise was heard as though the crystal inside was moving around and contacting the housing (or at least shifting a bit in its clamps). After opening up the top and bottom plates of the detector, no evidence of movement was found, but we will perform another electrical check to make sure it's still alright post-ka-chunk. |
| 1720 | After scrubbing all thermal contact joints, and wiping down w/ methanol (tower-spool, spool spacer rings, spool-source holder, source holder- detector (very light touch w/ sand paper)), assemble tower and place in purge cabinet. Tomorrow we'll attach side coaxes and perform finall tower electric check. |
|---|