| 1035 | Commence leak check of IVC flanges. Background leak rate of 7.8E-9 mbarL/s. Rate rose slightly to 8.4E-9 mbarL/s at bottom flange. |
| 1130 | After tightening, recommence leak check. Background rate of 9.0E-9 mbarL/s. Rate fell during test to 8.8E-9 mbarL/s. No leak detected. |
| 1200 | Raise dewar. |
| 1300 | Pump and flush main bath. |
| 1400 | Commence LN2 transfer. |
| 1530 | End LN2 transfer, due to Nitrogen dewar emptying. Current mixing chamber at 126 K and falling. Attach ping pong ball. |
| 1700 | Recommence LN2 transfer with full dewar. Current mixing chamber temperature 80K and falling. |
| 1740 | Pump out Cold Trap 2 with scroll pump in preparation for throughput test tomorrow. |
| 1804 | Level meter resistance 1.33 kΩ. Transfer complete. Current mixing chamber temperature at 77.3 K. Pump out IVC exchange gas. |