| 0850 | With G1=2 mbar, P1=1000 mbar and G2=11 mbar, close V2 and V1 and open V3 to allow He gas from still line into G1. G1 stabilizes to 665 mbar. |
| 0900 | Add He gas until G1 reads 998 mbar. Close V3 and pump on G1 lines until G1=1 mbar. Conduct throughput test by opening V1; throughput test gives a rate of 16 mbar/min. |
| 0910 | Close V1 and open V3 to see that G1 stabilizes to 988 mbar. Close V3 and open V2 to pump out G1 until G1<1 mbar. Conduct throughput test again; throughput test gives a rate of 16 mbar/min again. Commence pumping on fridge lines with scroll pump. |
| 0940 | Switch to turbo pump. |
| 1415 | Closed gate and condenser line speedivalve. Raised the Dewar. |
| 1500 | Pump and flush main bath. Commence LN2 transfer. Recommence pumping on fridge lines with turbopump. |
| 1647 | Closed gate valve and condenser line speedivalve. Isolated turbo pump. |
| 1701 | Completed LN2 transfer. Temperature of Dewar is currently 87.4 K. |
| 1717 | Commence pumping on IVC with scroll pump. Mixing chamber temperature currently at 82 K. |
| 1830 | Switch to evacuate IVC with turbo pump. |
| 1850 | Mixing chamber temperature 80.6 K. |