UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20160724

2016/07/24 (Sunday)

Previous Day

Setup: iZIP mode, DIB1/2/3 → cables → 3.2 MHz filters → DCRC55(1)/33(2)/50(3), Tower has been cooled below Al transition with mu-metal shield 45.9 cm below standard position
DCRCs on overnight taking bg data. Tower temperature going down slowly. It's still 5 mK higher than a couple of days ago though
0835 Tower/MC/Coldplate = 41.9/37.0/166 mK, Still = 1.42 K / 0.095 mbar, G1/G2 = 200/195 mbar, 1K Pot = 1.54 K / 5.0 mbar, MB = 41.6%
0840 Fill LN2 cold trap bath
0845 Close V6 to begin warming fridge. Close V13a, turn off 3He pump, apply 1 mW heat to MC. IVC = 10 nbar.
0850 Tower = 370 mK and rising, G1 = 82 mbar and falling. IVC = 8.6 nbar
0915 Tower jumps to 3.5 K. IVC = 340 nbar. Pump out IVC with turbo pump. Open V3: G1 pressure goes up from 40 to 250 mbar, so there must have been pressure buildup on the still side.
0925 Begin LHe transfer at 38.9%
0925 Still = 3.9 K and falling, G1 = 190 mbar and falling, 1K Pot = 1.63 K / 9 mbar
0935 Still = 2.6 K and falling, G1 = 82 mbar and falling, 1K Pot = 1.51 K / 5 mbar. Open needle valve a few more degrees
0945 Still = 2.5 K, G1 = 72 mbar, 1K Pot = 1.70 K / 40 mbar.
Turn off MC heater, turn on 3He pump, close V3, open V13a
0950 G1/G2 = 100/100 mbar and falling. 1K Pot = 1.68 K / 32 mbar. Begin opening V6 to 13.0%, G1/G2 go up a little.
Turbo = 0.74 nbar, close valve to IVC. IVC = 3 nbar
0955 G1/G2 = 95/90 mbar and falling. 1K Pot = 1.65 K / 24 mbar. Open V6 to 13.4%.
1005 G1/G2 = 250/235 mbar and falling slowly. 1K Pot = 1.63 K / 19 mbar. Open V6 to 13.6%.
1015 G1/G2 = 330/310 mbar and falling. 1K Pot = 1.62 K / 16 mbar. Still = 2.2 K. Open V6 to 13.8%.
1023 End LHe transfer at 91.6%
1025 G1/G2 = 395/370 mbar and flat. 1K Pot = 1.61 K / 14 mbar. Still = 2.0 K / 850 mbar. Open V6 to 14.0%.
1030 Release pressure from main bath (7 min after transfer ended)
1035 G1/G2 = 460/430 mbar and flat. 1K Pot = 1.60 K / 12 mbar. Still = 1.9 K / 38 mbar. Open V6 to 14.3%.
1045 G1/G2 = 420/395 mbar and falling. 1K Pot = 1.59 K / 11 mbar. Still = 1.6 K / 3.8 mbar. Open V6 to 16.2%.
Tower has been cooled below Al transition with mu-metal shield at standard position
1050 Tower/MC/Coldplate/Still = 0.69/0.74/0.66/1.41 K
1055 G1/G2 = 340/320 mbar and falling. 1K Pot = 1.58 K / 9.5 mbar. Still = 0.5 mbar. Tower = 0.63 K and falling. Open V6 to 100%.
1100 Tower = 325 mK and falling, Still = 0.150 mbar, G1/G2 = 330/310 mbar and falling slowly, 1K Pot = 1.58 K / 9.0 mbar
1103 Release pressure from main bath (40 min after transfer ended)
1105 Open 1K Pot needle valve a couple of degrees more.
1110 Tower = 130 mK and falling
1710 Tower = 41.9 mK, Still = 0.080 mbar, G1/G2 = 210/200 mbar, 1K Pot = 1.54 K / 5.5 mbar
1720 Check phonon channels, relock some and adjust some driver offsets, all look OK.
1727 Start 19 hours of 30min background series at -4/+4 V with FG=5/2/5, OG=8/3/8, with 1000 initial randoms, 1000 ending randoms, with 30s flash and 25 minute cooldown between series. Trigger on DIB1 phA with threshold of 30ADC bins, with 150 us pileup cut window.

Next Day