2015/12/01 (Tuesday)

Previous Day

Status: MC (Cernox) = 139 K. Overnight it cooled to a minimum of 130 K around 3:00 and then began to warm at a rate of 1.8 K/hour.
0830 MC = 138 K, IVC = 2.5 mbar, Sorb thermometer still flat at 250 K
0845 Restart LN2 transfer
0850 LN2 level resistor = 1.13 Ω
0900 Trap 1 (G1) = 44.7 mbar after warming overnight. Open to P2: P2 reads off scale (1000). Pump out trap with 4He pump, down to G1/P2 = 0.4/0.030 mbar.
0900 MC = 137.5 K, Sorb just begins to fall below 250 K.
0915 MC/Sorb = 134/239 K, IVC = 2.2 mbar, Level resistor = 1.246 Ω
0930 MC/Sorb = 120/203 K, IVC = 1.9 mbar, Level resistor = 1.307 Ω
0945 MC/Sorb = 111/178 K, IVC = 1.9 mbar, Level resistor = 1.312 Ω
1000 MC/Sorb = 103/157 K, IVC = 1.6 mbar, Level resistor = 1.318 Ω
1020 MC/Sorb = 95/137 K, IVC = 1.6 mbar, Level resistor = 1.322 Ω
1030 MC/Sorb = 92/132 K, IVC = 1.6 mbar, Level resistor = 1.324 Ω
1045 MC/Sorb = 89/128 K, IVC = 1.6 mbar, Level resistor = 1.325 Ω. Cease LN2 transfer (a little early, normally go to 1.33 Ω).
1050 Begin pumping out IVC, first with scroll pump, then with turbo
1055 IVC = 1.0e-4 mbar
1100 Perform electrical checkout on detector, all looks good
1105 IVC pressure pumping/isolated = 3.4e-6/4.6e-5 mbar
1120 IVC pressure pumping/isolated = 2.5e-6/4.6e-5 mbar
1200 IVC pressure pumping/isolated = 3.0e-6/4.6e-5 mbar. Stop pumping with turbo, start pumping with leak detector.
1220 Commence LN2 blowout. Leak rate started at 1.2E-5 mbarL/s.
1245 Finish filling cold trap dewar. With 792 mbar mixture in dump, begin cold trap cleaning through cold trap 1.
1330 G3 pressure drops precipitously, so LN2 blowout is finished. LD signal never increased, ends at 1.0e-5 mbarL/s.
1335 Stop pressurizing main bath: close V2a, V5a, V4a, V1a, and the He valve on the wall system.
1400 Pumped main bath down to 0.36 mbar and falling, so LN2 is indeed gone. Flush main bath.
1405 MC/Sorb = 87/127 K
1415 Add 5.4e-2 mbar He exchange gas to IVC
1425 Commence first LHe transfer (0.0%).
1430 Stop cryocleaning mixture. Pump contents of Trap 1 to dump.
1435 Begin pressurizing LHe storage Dewar.
1441 Isolate Trap 1, all mixture in dump, G2 = 801.9 mbar. Remove Trap 1 from LN2 Dewar
1450 MC/Sorb = 83/118 K, IVC = 1.9e-2 mbar
1400 Conduct a throughput test, and get a throughput rate of 33 mbar/min in G1. (G1 allowed to rise to about 700 mbar and fell to minimum of 40 mbar.) Pump mixture back to dump.
note Throughput rate is low compared to 2015/08/11 and 2015/06/04. But we were a bit warmer each of those previous times.
1505 MC/Sorb = 73/75 K, IVC = 1.2e-2 mbar
1525 MC/Sorb = 62/12.3 K, IVC = 1.0e-2 mbar
1535 MC/Tower = 56/50 K, IVC = 8.6e-3 mbar. Still/ColdPlate = 21/31 K. Sorb/1KPot = 6.9/6.1 K.
1550 MC/Tower = 50/52 K, IVC = 8.6e-3 mbar. Still/ColdPlate = 18/28 K. Sorb/1KPot = 6.7/5.7 K.
1605 MC/Tower = 43/50 K, IVC = 8.6e-3 mbar. Still/ColdPlate = 16/24 K. Sorb/1KPot = 6.4/5.4 K. Main bath = 47.2%.
1630 MC/Tower = 30/35 K, IVC = 8.6e-3 mbar. Still/ColdPlate = 12/18 K. Sorb/1KPot = 5.9/5.0 K. Main bath = 66.2%.
1635 Looks like Dewar is empty: recovery rate went very high and level stopped increasing. Main bath = 61.1%
1641 Cease LHe transfer (58.6%).
1645 MC/Tower = 23/27 K, IVC = 8.6e-3 mbar. Still/ColdPlate = 10/13 K. Sorb/1KPot = 5.7/4.9 K.
1710 MC/Tower = 15.4/19.6 K, IVC = 7.4e-3 mbar. Still/ColdPlate = 7.3/9.8 K. Sorb/1KPot = 5.5/4.6 K.
1740 MC/Tower = 10.8/12.5K. Commence turbopumping out IVC exchange gas. IVC = 2.2E-5mbar. Still/ColdPlate = 5.3/7.8 K. Sorb/1KPot = 5.5/4.6 K.