| | Setup: iZIP mode, DIB1/2/3 → cables → 3.2 MHz filters → DCRC55(1)/33(2)/50(3), Tower has been cooled below Al transition with mu-metal shield at standard position |
| | DCRCs powered overnight. Pumping on IVC with turbo pump overnight. |
| 1100 | Fill LN2 Cold trap full. |
| | Tower/MC/Coldplate = 40/47/162 mK, Still = 1.38 K / 55 μbar, G1/G2 = 168/151 mbar, 1K Pot = 1.46 K / 2.4 mbar, MB = 41.7%. Tweak 1K Pot. |
| 1122 | Commence LHe transfer (40.8%) |
| 1129 | 1K Pot = 1.66 K/ 22 mbar. |
| 1130 | Tried viewing pulses but programs kept crashing because DIB1 telnet had disconnected. Power cycled DCRC55 (DIB1) and re-established telnet session. All DIB1 phonons railed. Accidentally closed VNC viewer, unable to restart as it's on David's account and don't feel like setting up another right now. |
| 1200 | Cease LHe transfer (92.0%) |
| | 1K Pot = 1.60 K/ 12 mbar. |
| 1205 | Release main bath pressure 5 min after transfer |
| 1254 | Tweak 1K Pot = 7.5 mbar |
| | Release main bath pressure 55 min after fill |
| 1300 | 1K Pot = 1.68 K/ 32 mbar and falling slowly. Hopefully it'll settle in a good place tonight. |