| 1055 | Helium had depleted, causing G1 and G2 to rise. Commence pumping to dump. Turn off 1 K Pot. |
| 1100 | Fill LN2 cold trap full. |
| 1120 | Commence LHe transfer (-1.0%). |
| 1230 | End LHe transfer (91.2%). |
| | Turn on 1K Pot, using the He4 rotary pump. |
| 1400 | Stop pumping on 1K pot. |
| 1440 | Commence cold trap cleaning. |
| 1715 | Commence cryocleaning. Restart 1K Pot. |
| 1745 | Finish cryocleaning. Pump mixture to dump. |
| 1815 | Current pressures: G1: 0.2mbar, G2: 630.0mbar, P1: 15ubar. Commence condensation with 500mbar of mixture. Target G2 pressure of 130mbar. |
| 1900 | 130mbar of mixture left in dump. Close valve 9. Open V12A completely. G1: 54mbar, G2: 61mbar and stable. 1K pot at 1.694K, mixing chamber at 1.89K. Commence circulation. |
| 1917 | P1: .2mbar, Mixing chamber temperature of 585mK and dropping. |
| 1918 | Mixing chamber rising after hitting low of ~580mK. G1: 82.4mbar, G2: 105.6mbar. |
| 1922 | After reaching high of >830mK, mixing chamber temperature begins decreasing again. |
| 1955 | Mixing chamber now at 197.4mK with very slow downward trend. G1: 100.4mbar, G2: 116.4mbar. |