0830 Remove Cf source.
0850 Tower = 31 mK, Still = 2 mW / 0.11 mbar, G1/G2 = 220/200 mbar, 1K Pot = 1.69 K / 15 mbar, Main bath = 27.0%
0851 Stop data run, zero Q bias, flash.
0855 Fill LN cold trap Dewar
0903 Start data run.
0920 Stop data run, zero Q bias, flash.
0929 Start data run.
0945 Stop data run, zero Q bias, flash.
0954 Start data run.
1010 Stop data run, zero Q bias, flash.
1033 Start data run.
1050 Stop data run, zero Q bias, flash.
1129 Start data run.
1145 Stop data run, zero Q bias, flash.
1205 Start data run.
1220 Stop data run, zero Q bias, flash.
1245 Did some tests of event rate versus Ba source position. Triggering on DIB1pA (only) with a threshold of 200, timed how long it took for 10 triggers:
Ba position, down from top of shield Trigger rate
no source 10/4.0 sec
0 in. 10/2.4 sec
6 in. 10/1.9 sec
12 in. 10/<1 sec
1250 Estimated the amount of pileup events as a function of source position. Ba at 12 inches : 50% pileup; Ba at 6 inches: 30% pileup
1300 Estimated minimum phonon thresholds (to nearest 5) to avoid triggering on noise, for each phonon channel. Basic criterion was to have less than 10% noise-like pulses.
Minimum thresholds
pA pB pC pD
DIB1→DCRC31 20 20 20 20
DIB2→DCRC33 25 15 20 15
DIB3→DCRC50 15 15 15 15
1316 Test run to see what event rate the MultiDAQ can handle. Ba at 6 inches: rate 13 Hz, CPU 67%; Ba at 12 inches: 12 Hz, 62%; Ba at 24“ (detector level): 12 Hz, 70%. Strange: unlike previously, we are unable to “choke” the DAQ with data.
1330 Another rate versus position test, this time with DIB1pA threshold=300:
Ba position, down from top of shield Trigger rate
no source 10/6 sec
0 in. 10/4 sec
6 in. 10/3.5 sec
12 in. 10/3 sec
18 in. 10/3 sec
24 in. (det. level) 10/2 sec
1405 MC/Tower = 25.4/31.2 mK, Cold plate = 146 mK, Still = 2 mW / 1.15 K / 0.11 mbar, G1/G2 = 220/200 mbar, 1K Pot = 1.68 K / 15 mbar, Main bath = 16.5%. Switching the thermometer switch/plug did not cause any phonon channel railing.
1411 Tried pencil sharpener again. 9/12 phonon channels railed. Could restore them with relocks but 6 of them had shifted baselines requiring new driver offset settings.
1530 Received DCRC55 (RevC.1) from Bruno. Set IP to 131.225.52.95
1600 Remove DCRC31 and connect DCRC55 to DIB1
1650 Zap SQUIDs on DCRC55. Find SQUID setpoints:
DIB1 DCRC55 SQUID Settings
Channel Bias (mA) Lockpoint (mV) Vpp
A -87.05 -4.86 0.384
B -85.94 -3.89 0.356
C -83.99 -4.28 0.361
D -83.98 -2.82 0.357
1700 Commence LHe transfer (11.3%).
1735 Cease LHe transfer (85.6%).
1755 Producing IbIs curves for DCRC55→DIB1
1805 Begin overnight flashing, all 3 DIBs.
1810 Place Cf source in shield at detector level for overnight activation

next day