2016/04/30 (Saturday)
| Setup: iZIP mode, DIB1/2/3 → cables → 3.2 MHz filters → DCRC55/33/50, DCRCs powered overnight | |
| Several temperature spikes overnight to about 58 mK | |
| 1550 | Tower/MC/Coldplate = 52.9/47.4/302 mK, Still = 0.120 mbar, G1/G2 = 110/105 mbar, 1K Pot = 1.69 K / 10 mbar, Main Bath = 32.8% |
| 1558 | Begin LHe transfer @ 31.9% |
| 1605 | Fill LN2 cold trap bath. |
| 1647 | Finish LHe transfer @ 92.2% |
| 1653 | Release pressure from MB for 30 seconds |