| 1015 | Fill LN2 coldtrap. Reattach funnel to IVC. | |
| 1340 | Finish cryocleaning, pump mixture to dump. | |
| 1345 | Evacuate main bath and line to nitrogen gas. Close rotary pump speedivalve and flush main bath with nitrogen gas (G3 at 80 mbar). |
| 1420 | Evacuate 1K Pot. | |
| 1428 | Fed the carassius auratus auratus | |
| 1505 | Fill IVC with 6.3 mbar He exchange gas. | |
| 1510 | Start LN2 transfer. | |
| 1410 | With G1=0.1 mbar, P1=11 ubar, and G2=619.9 mbar, isolate dump and begin pumping on cold traps with rotary pump. | |
| 1635 | End LN2 transfer. | |
| 1730 | With mixing chamber temperature of 80.17 K, pump out IVC He exchange gas (initially with scroll pump). | |
| 1810 | Finish first round of coldtrap cleaning. | |
| 1850 | Finish second round of coldtrap cleaning. | |
| 1911 | Close all valves on IGH, insert cold traps into dewar. Fill LN2 coldtraps full. | |
| 1920 | Start cryocleaning mixture through coldtrap 2. | |