| 0905 | Fill LN2 cold trap full. |
| 1215 | Start 1K Pot and start condensing procedure. Since 650 mbar worth of mixture in dump, prepare to close V9 when G2=400 mbar, allowing 250 mbar worth of mixture into the system. Current mixing chamber temperature at 18 K. |
| 1320 | Close V9 with 400 mbar mixture in dump (250 mbar in fridge lines.) Currently, mixing chamber temperature at 2.5 K. |
| 1325 | V12 opened all the way. Lower 1K Pot temperature. |
| 1330 | Commence circulation procedure. |
| 1355 | V6 open completely and mixing chamber temperature dropping. In an attempt to eliminate variables that have changed since moving labs, disconnect He recovery system from main bath, and allow to vent from bung hole at top of main bath. |
| 1505 | Reconnect He recovery system to main bath and commence recovering He. |
| 1549 | Switch to measuring the Still thermometer to see if oscillations are present on all thermometers. |
| 1612 | Oscillations are seen on still thermometer. Stop 1K Pot and pump mixture to dump. |
| 1715 | G2 at 649.9mbar, begin closing V6 in preparation for another condensation. Close all valves on IGH. 1K Pot temperature at 3.149.K Mixing Chamber Temperature at 8.5K. Start pumping on 1K pot. |
| 1750 | V12A fully opened. |
| 1800 | Open V14 to pump out the rest of mixture from the dump. |
| 1900 | Mixing chamber temperature reaches a minimum of 554 K and is now rising (possibly oscillating). P2=0.55 mbar. |
| 1910 | Mixing chamber temperature reaches 481 mbar and is still decreasing. P1=450 ubar. Fill LN2 cold trap full. |
| 2240 | Mixing chamber temperature has been stable at 483 mK for last few hours. Close valve V14 on IGH to stop extracting mixture from dump; P1 pressure 260 μbar. Leave overnight. |
| 2245 | Fill N2 cold trap full. |