| | Setup: iZIP mode, DIB1/2/3 → cables → 3.2 MHz filters → DCRC55/33/50 |
| | Taking Y-Be photoneutron data over weekend. |
| 1048 | Anthony takes a few short series of Y-Be-test data at 0/0V (by accident) |
| 1112 | Begin LHe transfer (31.3%) |
| 1135 | Fill LN2 cold trap |
| | Tower/MC(H35)/MC sensor/Cold Plate = 31.4/??/??/??mK, Still = 1.10 K / 0.11 mbar, G1/G2 = 164/164 mbar, 1K Pot = 1.71 K / 19 mbar, Main bath = 36.3% |
| 1151 | Anthony starts 22 series of 30min Y-Be-test data at 0/0V (by accident), presumably with FG=5/2/5, OG=3, 1000 initial randoms, 1000 ending randoms, and apparently 30s flash and 25 minute cooldown before series. Trigger settings are a test of high-energy rejection by using a highish threshold on DIB1qI as well as the low threshold on DIB1pA, then applying pileup rejection with a smallish time window. |
| 1159 | Finish LHe transfer (91.2%) |
| 1205 | Released main bath pressure for around 20 sec |