UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20160131

2016/01/31 (Sunday)

Previous Day

Setup: iZIP mode, DIB1/2/3 → cables → 3.2 MHz filters → DCRC55/33/50
Taking Y-Be photoneutron data over weekend.
1048 Anthony takes a few short series of Y-Be-test data at 0/0V (by accident)
1112 Begin LHe transfer (31.3%)
1135 Fill LN2 cold trap
Tower/MC(H35)/MC sensor/Cold Plate = 31.4/??/??/??mK, Still = 1.10 K / 0.11 mbar, G1/G2 = 164/164 mbar, 1K Pot = 1.71 K / 19 mbar, Main bath = 36.3%
1151 Anthony starts 22 series of 30min Y-Be-test data at 0/0V (by accident), presumably with FG=5/2/5, OG=3, 1000 initial randoms, 1000 ending randoms, and apparently 30s flash and 25 minute cooldown before series. Trigger settings are a test of high-energy rejection by using a highish threshold on DIB1qI as well as the low threshold on DIB1pA, then applying pileup rejection with a smallish time window.
1159 Finish LHe transfer (91.2%)
1205 Released main bath pressure for around 20 sec

Next Day